IAC logo
IAC Assessment: HO0094
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0094
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1994
Principal Product Flexible Packaging
NAICS n/a
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 70,000
Annual Production 480,000,000 Pieces
Production Hrs. Annual 2,400
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,929 602,286 kWh $0.13
Natural Gas $4,795 737 MMBtu $6.51
TOTAL ENERGY COSTS $82,724
RECOMMENDED SAVINGS* $3,379 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,302
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,185
Cost:
$1,246
$1,185 9,086 - - $1,185
9,086
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$243
Cost:
$655
$243 1,758 - - $243
1,758
kWh
-
-
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$93
Cost:
$215
$93 586 - - $93
586
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$64
Cost:
$300
$64 586 - - $64
586
kWh
-
-
MMBtu
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$265
Cost:
-
$265 2,052 - - $265
2,052
kWh
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$276
Cost:
$378
- - $276 43 -
-
kWh
$276
43
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$441
Cost:
$400
$441 3,517 - - $441
3,517
kWh
-
-
MMBtu
08: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$812
Cost:
$500
$812 6,448 - - $812
6,448
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,379
Cost:
$3,694
$3,103 24,033 $276 43 $3,103
24,033
kWh
$276
43
MMBtu
TOTAL IMPLEMENTED Savings:
$2,302
Cost:
$3,194
$2,026 15,533 $276 43 $2,026
15,533
kWh
$276
43
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas