Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1995
Principal Product Lighting Fixtures
NAICS n/a
SIC 3646 - Commercial Lighting Fixtures
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 45,000
Annual Production 540,000 Pounds
Production Hrs. Annual 2,500
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $24,660 103,751 kWh $0.24
Natural Gas $14,911 1,667 MMBtu $8.94
Fuel Oil #2 $13,115 1,479 MMBtu $8.87
TOTAL ENERGY COSTS $85,186
RECOMMENDED SAVINGS* $21,458 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,145
#|Description Savings
Cost
Status Electricity Usage Other Liquid (haz) Electricity Usage Other Liquid (haz)
$ kWh $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,384
Cost:
$1,243
$2,384 9,086 - - $2,384
9,086
kWh
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,879
Cost:
$7,205
$2,879 11,137 - - $2,879
11,137
kWh
-
-
gal
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$123
Cost:
$287
$123 586 - - $123
586
kWh
-
-
gal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$292
Cost:
$500
$292 1,172 - - $292
1,172
kWh
-
-
gal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$467
Cost:
$675
$467 1,758 - - $467
1,758
kWh
-
-
gal
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$15,313
Cost:
$1,000
- - $15,313 590 -
-
kWh
$15,313
590
gal
TOTAL RECOMMENDED Savings:
$21,458
Cost:
$10,910
$6,145 23,739 $15,313 590 $6,145
23,739
kWh
$15,313
590
gal
TOTAL IMPLEMENTED Savings:
$6,145
Cost:
$9,910
$6,145 23,739 - - $6,145
23,739
kWh
-
-
gal
Savings
Cost
$ kWh $ gal
Electricity Usage Other Liquid (haz) Electricity Usage Other Liquid (haz)