IAC logo
IAC Assessment: HO0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1996
Principal Product Artificial Joints
NAICS n/a
SIC 3842 - Surgical Appliances And Supplies
Sales $50,000,000-$100,000,000
# of Employees 480
Plant Area (Sq.Ft.) 200,000
Annual Production 130,000 Pieces
Production Hrs. Annual 4,160
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $848,324 11,923,212 kWh $0.07
Electricity Demand $138,863 22,470 kW-months/year $6.18
Natural Gas $32,856 5,134 MMBtu $6.40
TOTAL ENERGY COSTS $1,020,043
RECOMMENDED SAVINGS* $118,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43,564
Cost:
$111,891
$33,130 466,589 $10,434 1,688 - - - - $33,130
466,589
kWh
$10,434
1,688
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,164
Cost:
$1,621
$1,040 14,654 $124 20 - - - - $1,040
14,654
kWh
$124
20
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$493
Cost:
$400
$493 7,034 - - - - - - $493
7,034
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$962
Cost:
$1,650
$962 12,016 - - - - - - $962
12,016
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,870
Cost:
$1,110
- - - - $16,870 2,625 - - -
-
kWh
-
-
kW-months/year
$16,870
2,625
MMBtu
-
-
lb
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,707
Cost:
-
- - $3,707 600 - - - - -
-
kWh
$3,707
600
kW-months/year
-
-
MMBtu
-
-
lb
07: 4.213 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING Savings:
$51,425
Cost:
-
- - - - - - $51,425 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$51,425
-
lb
TOTAL RECOMMENDED Savings:
$118,185
Cost:
$116,672
$35,625 500,293 $14,265 2,308 $16,870 2,625 $51,425 - $35,625
500,293
kWh
$14,265
2,308
kW-months/year
$16,870
2,625
MMBtu
$51,425
-
lb
TOTAL IMPLEMENTED Savings:
$962
Cost:
$1,650
$962 12,016 - - - - - - $962
12,016
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)