IAC logo
IAC Assessment: HO0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1996
Principal Product Business and Insurance Forms
NAICS n/a
SIC 2761 - Manifold Business Forms
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 120,000
Annual Production 72,000,000 Pieces
Production Hrs. Annual 4,165
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,366 494,725 kWh $0.06
Electricity Demand $52,405 2,273 kW-months/year $23.06
Electricity Fees $6,401 - $ -
Natural Gas $2,565 244 MMBtu $10.51
Fuel Oil #6 $35,024 6,884 MMBtu $5.09
TOTAL ENERGY COSTS $127,761
RECOMMENDED SAVINGS* $361,231 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,309
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,200
Cost:
$11,954
$4,496 70,926 $4,704 204 - - - - $4,496
70,926
kWh
$4,704
204
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$89
Cost:
$75
$89 1,465 - - - - - - $89
1,465
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$388
Cost:
$1,000
$388 6,155 - - - - - - $388
6,155
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$9,585
Cost:
$1,502
$9,585 267,292 - - - - - - $9,585
267,292
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$660
Cost:
$628
- - - - $660 130 - - -
-
kWh
-
-
kW-months/year
$660
130
MMBtu
-
-
lb
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$340,000
Cost:
-
- - - - - - $340,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$340,000
-
lb
07: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$1,309
Cost:
$20,000
$630 9,965 $679 30 - - - - $630
9,965
kWh
$679
30
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$361,231
Cost:
$35,159
$15,188 355,803 $5,383 234 $660 130 $340,000 - $15,188
355,803
kWh
$5,383
234
kW-months/year
$660
130
MMBtu
$340,000
-
lb
TOTAL IMPLEMENTED Savings:
$1,309
Cost:
$20,000
$630 9,965 $679 30 - - - - $630
9,965
kWh
$679
30
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #6 Solid Waste (non-haz)