IAC logo
IAC Assessment: HO0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Retail Plastic Bags
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 40,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 4,080
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,307 880,129 kWh $0.06
Electricity Demand $76,651 3,350 kW-months/year $22.88
Electricity Fees $10,726 - $ -
Natural Gas $3,944 263 MMBtu $15.00
Fuel Oil #2 $11,755 2,330 MMBtu $5.05
TOTAL ENERGY COSTS $203,383
RECOMMENDED SAVINGS* $67,688 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,443
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,952
Cost:
$4,592
$1,854 31,360 $1,098 48 - - - - - - $1,854
31,360
kWh
$1,098
48
kW-months/year
-
-
$
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$618
Cost:
$1,160
$618 10,844 - - - - - - - - $618
10,844
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$679
Cost:
$400
$416 7,327 $263 12 - - - - - - $416
7,327
kWh
$263
12
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,568
Cost:
$6,500
- - - - - - $2,568 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,568
-
lb
-
-
$
05: 4.125 Savings:
$3,592
Cost:
$23,000
$(-1,448) (-25,205) - - - - - - $5,040 - $(-1,448)
(-25,205)
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$5,040
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$15,974
Cost:
-
- - $31,574 1,380 - - $9,400 20,000 $(-25,000) - -
-
kWh
$31,574
1,380
kW-months/year
-
-
$
$9,400
20,000
lb
$(-25,000)
-
$
07: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$41,305
Cost:
$100
- - - - $41,305 - - - - - -
-
kWh
-
-
kW-months/year
$41,305
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$67,688
Cost:
$35,752
$1,440 24,326 $32,935 1,440 $41,305 - $11,968 20,000 $(-19,960) - $1,440
24,326
kWh
$32,935
1,440
kW-months/year
$41,305
-
$
$11,968
20,000
lb
$(-19,960)
-
$
TOTAL IMPLEMENTED Savings:
$47,443
Cost:
$12,352
$2,472 42,204 $1,098 48 $41,305 - $2,568 - - - $2,472
42,204
kWh
$1,098
48
kW-months/year
$41,305
-
$
$2,568
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes