IAC Assessment: HO0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1997
Principal Product Carpet Swatch catalogs
NAICS n/a
SIC 2720 -
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 150,000
Annual Production 500,000 Pounds
Production Hrs. Annual 2,956
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $122,841 2,194,314 kWh $0.06
Electricity Demand $153,937 7,296 kW-months/year $21.10
Electricity Fees $40,393 - $ -
Natural Gas $41,623 7,385 MMBtu $5.64
TOTAL ENERGY COSTS $408,794
RECOMMENDED SAVINGS* $35,983 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,800
Cost:
$33,870
$4,759 84,994 $7,041 348 - - - - - - - - $4,759
84,994
kWh
$7,041
348
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$168
Cost:
$358
$168 2,931 - - - - - - - - - - $168
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$367
Cost:
$400
$159 2,931 $208 16 - - - - - - - - $159
2,931
kWh
$208
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$620
Cost:
$444
- - - - $620 110 - - - - - - -
-
kWh
-
-
kW-months/year
$620
110
MMBtu
-
-
lb
-
-
$
-
-
$
05: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$8,160
Cost:
$35,000
- - - - - - - - $8,160 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$8,160
-
$
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$968
Cost:
$750
- - - - $968 172 - - - - - - -
-
kWh
-
-
kW-months/year
$968
172
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$13,500
Cost:
-
- - - - - - $15,000 - $(-1,500) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,000
-
lb
$(-1,500)
-
$
-
-
$
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$400
Cost:
$500
- - - - - - - - - - $400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$400
-
$
TOTAL RECOMMENDED Savings:
$35,983
Cost:
$71,322
$5,086 90,856 $7,249 364 $1,588 282 $15,000 - $6,660 - $400 - $5,086
90,856
kWh
$7,249
364
kW-months/year
$1,588
282
MMBtu
$15,000
-
lb
$6,660
-
$
$400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material