IAC Assessment: HO0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1998
Principal Product pretzels
NAICS n/a
SIC 2052 - Cookies And Crackers
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 125,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 5,880
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $377,158 7,450,469 kWh $0.05
Electricity Demand $84,930 13,188 kW-months/year $6.44
Electricity Fees $(-26,939) - $ -
Natural Gas $1,152,353 272,412 MMBtu $4.23
TOTAL ENERGY COSTS $1,617,502
RECOMMENDED SAVINGS* $157,217 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $84,819
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,566
Cost:
$25,636
$6,248 122,802 $2,318 360 - - - - - - $6,248
122,802
kWh
$2,318
360
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,519
Cost:
$9,190
$6,519 128,664 - - - - - - - - $6,519
128,664
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$12,311
Cost:
$1,200
- - - - $12,311 830 - - - - -
-
kWh
-
-
kW-months/year
$12,311
830
MMBtu
-
-
lb
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$36,268
Cost:
$18,500
- - - - $36,268 8,574 - - - - -
-
kWh
-
-
kW-months/year
$36,268
8,574
MMBtu
-
-
lb
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$24,394
Cost:
$13,600
$36,724 729,484 - - $(-12,330) (-2,914) - - - - $36,724
729,484
kWh
-
-
kW-months/year
$(-12,330)
(-2,914)
MMBtu
-
-
lb
-
-
$
06: 4.5150 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$26,460
Cost:
$103,176
- - - - - - - - $26,460 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$26,460
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$26,460
Cost:
$30,270
- - - - - - - - $26,460 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$26,460
-
$
08: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$15,135
Cost:
$200
- - - - - - $15,135 336,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,135
336,000
lb
-
-
$
09: 3.7141 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM Savings:
$1,104
Cost:
$535
- - - - - - - - $1,104 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,104
-
$
TOTAL RECOMMENDED Savings:
$157,217
Cost:
$202,307
$49,491 980,950 $2,318 360 $36,249 6,490 $15,135 336,000 $54,024 - $49,491
980,950
kWh
$2,318
360
kW-months/year
$36,249
6,490
MMBtu
$15,135
336,000
lb
$54,024
-
$
TOTAL IMPLEMENTED Savings:
$84,819
Cost:
$127,366
$43,243 858,148 - - $(-19) (-2,084) $15,135 336,000 $26,460 - $43,243
858,148
kWh
-
-
kW-months/year
$(-19)
(-2,084)
MMBtu
$15,135
336,000
lb
$26,460
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes