IAC logo
IAC Assessment: HO0192
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0192
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1999
Principal Product Primary Lithium Batteries
NAICS n/a
SIC 3692 - Primary Batteries, Dry And Wet
Sales $10,000,000-$50,000,000
# of Employees 410
Plant Area (Sq.Ft.) 43,000
Annual Production 6,750,000 Pieces
Production Hrs. Annual 2,250
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,313 1,128,957 kWh $0.05
Electricity Demand $28,024 4,038 kW-months/year $6.94
Electricity Fees $41,474 - $ -
Natural Gas $44,952 9,081 MMBtu $4.95
TOTAL ENERGY COSTS $199,563
RECOMMENDED SAVINGS* $24,831 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,014
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,539
Cost:
$8,289
$2,758 56,272 $781 113 - - - - - - - - $2,758
56,272
kWh
$781
113
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$409
Cost:
$1,120
$409 8,499 - - - - - - - - - - $409
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$2,678
Cost:
$4,800
- - - - $2,678 541 - - - - - - -
-
kWh
-
-
kW-months/year
$2,678
541
MMBtu
-
-
lb
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,083
Cost:
$520
- - - - $2,083 113 - - - - - - -
-
kWh
-
-
kW-months/year
$2,083
113
MMBtu
-
-
lb
-
-
lb
-
-
$
05: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$562
Cost:
$700
- - - - $562 114 - - - - - - -
-
kWh
-
-
kW-months/year
$562
114
MMBtu
-
-
lb
-
-
lb
-
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$960
Cost:
$600
- - - - - - - - - - $960 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$960
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$6,000
Cost:
$5,000
- - - - - - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$6,000
-
$
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,200
Cost:
$1,000
- - - - - - $1,200 336,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,200
336,000
lb
-
-
lb
-
-
$
09: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,400
Cost:
$1,000
- - - - - - $2,400 168,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,400
168,000
lb
-
-
lb
-
-
$
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$5,000
Cost:
$1,000
- - - - - - - - $5,000 5,928 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$5,000
5,928
lb
-
-
$
TOTAL RECOMMENDED Savings:
$24,831
Cost:
$24,029
$3,167 64,771 $781 113 $5,323 768 $3,600 504,000 $5,000 5,928 $6,960 - $3,167
64,771
kWh
$781
113
kW-months/year
$5,323
768
MMBtu
$3,600
504,000
lb
$5,000
5,928
lb
$6,960
-
$
TOTAL IMPLEMENTED Savings:
$9,014
Cost:
$3,940
$409 8,499 - - $2,645 227 - - $5,000 5,928 $960 - $409
8,499
kWh
-
-
kW-months/year
$2,645
227
MMBtu
-
-
lb
$5,000
5,928
lb
$960
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) One-time Revenue or Avoided Cost