Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1995
Principal Product automotive reconditioning equipment
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 108,862
Annual Production 5,400 Pieces
Production Hrs. Annual 6,864
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,880 2,080,891 kWh $0.06
Natural Gas $3,814 888 MMBtu $4.30
TOTAL ENERGY COSTS $156,509
RECOMMENDED SAVINGS* $43,778 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,478
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes
$ kWh $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,199
Cost:
$58,658
$20,199 316,237 - - - - $20,199
316,237
kWh
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,310
Cost:
$3,860
$3,310 51,876 - - - - $3,310
51,876
kWh
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,777
Cost:
$9,655
$2,777 43,376 - - - - $2,777
43,376
kWh
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,159
Cost:
$1,609
$1,159 18,171 - - - - $1,159
18,171
kWh
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,029
Cost:
$500
$1,029 16,120 - - - - $1,029
16,120
kWh
-
-
lb
-
-
$
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$11,610
Cost:
$1,200
- - $11,610 1,881 - - -
-
kWh
$11,610
1,881
lb
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$2,022
Cost:
$1,716
- - $2,022 1,608 - - -
-
kWh
$2,022
1,608
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,672
Cost:
$8,000
- - - - $1,672 - -
-
kWh
-
-
lb
$1,672
-
$
TOTAL RECOMMENDED Savings:
$43,778
Cost:
$85,198
$28,474 445,780 $13,632 3,489 $1,672 - $28,474
445,780
kWh
$13,632
3,489
lb
$1,672
-
$
TOTAL IMPLEMENTED Savings:
$5,478
Cost:
$18,155
$3,806 59,496 - - $1,672 - $3,806
59,496
kWh
-
-
lb
$1,672
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes