IAC Assessment: IA0201
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0201
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1998
Principal Product custom processed meat products
NAICS n/a
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 40,000
Annual Production 14,000,000 Pounds
Production Hrs. Annual 2,860
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,031 3,645,956 kWh $0.04
Electricity Demand $1,079 99 kW-months/year $10.90
Natural Gas $68,831 19,820 MMBtu $3.47
TOTAL ENERGY COSTS $272,425
RECOMMENDED SAVINGS* $31,143 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,942
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,454
Cost:
$117
$1,053 26,377 $401 36 - - - - - - $1,053
26,377
kWh
$401
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,201
Cost:
$1,368
$627 15,826 $574 52 - - - - - - $627
15,826
kWh
$574
52
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$782
Cost:
$1,825
$355 8,792 $427 38 - - - - - - $355
8,792
kWh
$427
38
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$370
Cost:
$732
$370 9,379 - - - - - - - - $370
9,379
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$223
Cost:
$25
$103 2,638 $120 11 - - - - - - $103
2,638
kWh
$120
11
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$13,440
Cost:
$6,387
- - - - - - - - $13,440 141,804 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$13,440
141,804
lb
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$8,942
Cost:
$1,355
$(-84) (-2,052) $(-67) (-6) - - $9,093 1,885,401 - - $(-84)
(-2,052)
kWh
$(-67)
(-6)
kW-months/year
-
-
MMBtu
$9,093
1,885,401
Tgal
-
-
lb
08: 3.4151 MINIMIZE WATER USAGE Savings:
$4,731
Cost:
$5,000
$(-641) (-16,120) $(-748) (-67) $897 261 $5,223 868,159 - - $(-641)
(-16,120)
kWh
$(-748)
(-67)
kW-months/year
$897
261
MMBtu
$5,223
868,159
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$31,143
Cost:
$16,809
$1,783 44,840 $707 64 $897 261 $14,316 2,753,560 $13,440 141,804 $1,783
44,840
kWh
$707
64
kW-months/year
$897
261
MMBtu
$14,316
2,753,560
Tgal
$13,440
141,804
lb
TOTAL IMPLEMENTED Savings:
$8,942
Cost:
$1,355
$(-84) (-2,052) $(-67) (-6) - - $9,093 1,885,401 - - $(-84)
(-2,052)
kWh
$(-67)
(-6)
kW-months/year
-
-
MMBtu
$9,093
1,885,401
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)