Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2005 |
Principal Product | Printed Materials |
NAICS | 323111 - Commercial Printing (except Screen and Books) |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 231,500 |
Annual Production | 15,000 Tons |
Production Hrs. Annual | 6,240 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $274,452 | 8,632,000 | kWh | $0.03 |
Electricity Demand | $108,195 | 19,368 | kW-months/year | $5.59 |
Electricity Fees | $91,936 | - | $ | - |
Natural Gas | $243,926 | 36,638 | MMBtu | $6.66 |
TOTAL ENERGY COSTS | $727,010 | |||
RECOMMENDED SAVINGS* | $567,913 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $464 Cost: $51 |
$230 | 10,608 | $234 | 20 | - | - | - | - | - | - | - | - |
$230 10,608 kWh |
$234 20 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,156 Cost: $40 |
$1,070 | 49,296 | $1,086 | 95 | - | - | - | - | - | - | - | - |
$1,070 49,296 kWh |
$1,086 95 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,908 Cost: $1,094 |
$979 | 45,106 | $929 | 88 | - | - | - | - | - | - | - | - |
$979 45,106 kWh |
$929 88 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,440 Cost: $1,650 |
- | - | - | - | $5,440 | 898 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,440 898 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $265 Cost: $304 |
$131 | 6,037 | $134 | 12 | - | - | - | - | - | - | - | - |
$131 6,037 kWh |
$134 12 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $250 Cost: $349 |
$124 | 5,703 | $126 | 11 | - | - | - | - | - | - | - | - |
$124 5,703 kWh |
$126 11 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $2,035 Cost: $160 |
- | - | - | - | - | - | - | - | - | - | $2,035 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$2,035 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $49,000 Cost: $500 |
- | - | - | - | - | - | $49,000 | 297,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$49,000 297,500 lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $499,200 Cost: $800,000 |
- | - | - | - | - | - | - | - | $499,200 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$499,200 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,683 Cost: $20,487 |
$1,727 | 79,454 | $2,956 | 258 | - | - | - | - | - | - | - | - |
$1,727 79,454 kWh |
$2,956 258 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,703 Cost: $2,772 |
$846 | 38,958 | $857 | 75 | - | - | - | - | - | - | - | - |
$846 38,958 kWh |
$857 75 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $809 Cost: $2,233 |
$809 | 37,298 | - | - | - | - | - | - | - | - | - | - |
$809 37,298 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $567,913 Cost: $829,640 |
$5,916 | 272,460 | $6,322 | 559 | $5,440 | 898 | $49,000 | 297,500 | $499,200 | - | $2,035 | - | $5,916 272,460 kWh |
$6,322 559 kW-months/year |
$5,440 898 MMBtu |
$49,000 297,500 lb |
$499,200 - $ |
$2,035 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption |