Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2015
Principal Product OEM Metal Stampings
NAICS 336370 - Motor Vehicle Metal Stamping
SIC 3465 - Automotive Stampings
Sales $50,000,000-$100,000,000
# of Employees 262
Plant Area (Sq.Ft.) 178,976
Annual Production 1,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $251,977 7,500,400 kWh $0.03
Electricity Demand $230,847 14,400 kW-months/year $16.03
Natural Gas $78,025 12,725 MMBtu $6.13
TOTAL ENERGY COSTS $560,849
RECOMMENDED SAVINGS* $64,456 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,227
Cost:
$82,355
$8,556 254,643 $9,671 606 - - $8,556
254,643
kWh
$9,671
606
kW-months/year
-
-
MMBtu
02: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$17,173
Cost:
$8,320
$2,417 71,929 - - $14,756 2,407 $2,417
71,929
kWh
-
-
kW-months/year
$14,756
2,407
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,596
Cost:
$700
$8,150 242,568 $6,446 404 - - $8,150
242,568
kWh
$6,446
404
kW-months/year
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,432
Cost:
$23,803
$3,591 106,876 $2,841 178 - - $3,591
106,876
kWh
$2,841
178
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,809
Cost:
$140
$2,685 79,920 $2,124 133 - - $2,685
79,920
kWh
$2,124
133
kW-months/year
-
-
MMBtu
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$1,746
Cost:
$60
$904 26,905 $842 53 - - $904
26,905
kWh
$842
53
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,065
Cost:
$2,700
$1,065 31,640 - - - - $1,065
31,640
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$408
Cost:
$2,000
$218 6,501 $190 11 - - $218
6,501
kWh
$190
11
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,456
Cost:
$120,078
$27,586 820,982 $22,114 1,385 $14,756 2,407 $27,586
820,982
kWh
$22,114
1,385
kW-months/year
$14,756
2,407
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas