IAC Assessment: IC0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2008
Principal Product Metal PLating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 96,000
Annual Production 8,500,000 Pounds
Production Hrs. Annual 4,208
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,047 468,173 kWh $0.07
Electricity Demand $7,995 1,264 kW-months/year $6.33
Natural Gas $10,489 1,101 MMBtu $9.53
TOTAL ENERGY COSTS $90,597
RECOMMENDED SAVINGS* $28,863 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,851
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$261
Cost:
$300
$72 1,016 $6 1 - - - - $56 - $127 - $72
1,016
kWh
$6
1
kW-months/year
-
-
MMBtu
-
-
Tgal
$56
-
$
$127
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$156
Cost:
$102
$90 1,262 $25 4 - - - - $43 - $(-2) - $90
1,262
kWh
$25
4
kW-months/year
-
-
MMBtu
-
-
Tgal
$43
-
$
$(-2)
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,624
Cost:
$2,693
$1,290 18,178 $334 53 - - - - - - - - $1,290
18,178
kWh
$334
53
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$476
Cost:
$1,278
$381 5,376 $95 15 - - - - - - - - $381
5,376
kWh
$95
15
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$55
Cost:
-
$36 506 $19 3 - - - - - - - - $36
506
kWh
$19
3
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,124
Cost:
$913
$896 12,624 $228 36 - - - - - - - - $896
12,624
kWh
$228
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$4,155
Cost:
-
- - - - $4,155 436 - - - - - - -
-
kWh
-
-
kW-months/year
$4,155
436
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$21,012
Cost:
$27,696
- - - - - - $21,012 3,420,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,012
3,420,000
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$28,863
Cost:
$32,982
$2,765 38,962 $707 112 $4,155 436 $21,012 3,420,000 $99 - $125 - $2,765
38,962
kWh
$707
112
kW-months/year
$4,155
436
MMBtu
$21,012
3,420,000
Tgal
$99
-
$
$125
-
$
TOTAL IMPLEMENTED Savings:
$7,851
Cost:
$5,286
$2,765 38,962 $707 112 $4,155 436 - - $99 - $125 - $2,765
38,962
kWh
$707
112
kW-months/year
$4,155
436
MMBtu
-
-
Tgal
$99
-
$
$125
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost