IAC Assessment: IC0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IC0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Illinois, Chicago
Assessment Year 2011
Principal Product Corrugated Sheets and Displays
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 164
Plant Area (Sq.Ft.) 235,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,614 4,281,792 kWh $0.05
Electricity Demand $111,471 11,124 kW-months/year $10.02
Natural Gas $862,295 65,283 MMBtu $13.21
TOTAL ENERGY COSTS $1,222,429
RECOMMENDED SAVINGS* $88,089 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$647
Cost:
$1
$252 4,940 $68 7 - - - - $327 - $252
4,940
kWh
$68
7
kW-months/year
-
-
MMBtu
-
-
Tgal
$327
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,738
Cost:
$4,051
$1,117 21,885 $621 62 - - - - - - $1,117
21,885
kWh
$621
62
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,192
Cost:
$13,100
$5,158 101,146 $34 3 - - - - - - $5,158
101,146
kWh
$34
3
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,894
Cost:
$6,894
$6,894 135,159 - - - - - - - - $6,894
135,159
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.422 Hardware Savings:
$821
Cost:
$6,057
$821 16,408 - - - - - - - - $821
16,408
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$773
Cost:
-
$773 10,531 - - - - - - - - $773
10,531
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,036
Cost:
-
$1,111 21,775 $925 92 - - - - - - $1,111
21,775
kWh
$925
92
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,984
Cost:
$76
- - - - $15,984 1,145 - - - - -
-
kWh
-
-
kW-months/year
$15,984
1,145
MMBtu
-
-
Tgal
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,926
Cost:
$2,087
- - - - $6,926 496 - - - - -
-
kWh
-
-
kW-months/year
$6,926
496
MMBtu
-
-
Tgal
-
-
$
10: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$10,204
Cost:
$4,209
- - - - $10,204 731 - - - - -
-
kWh
-
-
kW-months/year
$10,204
731
MMBtu
-
-
Tgal
-
-
$
11: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,793
Cost:
$1,000
- - - - $8,515 611 $278 75,332 - - -
-
kWh
-
-
kW-months/year
$8,515
611
MMBtu
$278
75,332
Tgal
-
-
$
12: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$7,693
Cost:
$8,950
$46 896 - - $7,035 504 $612 165,360 - - $46
896
kWh
-
-
kW-months/year
$7,035
504
MMBtu
$612
165,360
Tgal
-
-
$
13: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$7,693
Cost:
$8,950
$46 896 - - $7,035 504 $612 165,360 - - $46
896
kWh
-
-
kW-months/year
$7,035
504
MMBtu
$612
165,360
Tgal
-
-
$
14: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,826
Cost:
$1,223
- - - - $6,826 489 - - - - -
-
kWh
-
-
kW-months/year
$6,826
489
MMBtu
-
-
Tgal
-
-
$
15: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$5,752
Cost:
-
- - - - $5,752 412 - - - - -
-
kWh
-
-
kW-months/year
$5,752
412
MMBtu
-
-
Tgal
-
-
$
16: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$117
Cost:
-
$92 1,700 $25 2 - - - - - - $92
1,700
kWh
$25
2
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$88,089
Cost:
$56,598
$16,310 315,336 $1,673 167 $68,277 4,892 $1,502 406,052 $327 - $16,310
315,336
kWh
$1,673
167
kW-months/year
$68,277
4,892
MMBtu
$1,502
406,052
Tgal
$327
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost