IAC logo
IAC Assessment: KU0022
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0022
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1981
Principal Product PRINTED PAPER PRODUCTS
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,040
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,333 863,423 kWh $0.04
Natural Gas $5,811 2,033 MMBtu $2.86
TOTAL ENERGY COSTS $44,144
RECOMMENDED SAVINGS* $9,705 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,880
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,870
Cost:
$5,633
$3,870 87,339 - - $3,870
87,339
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,320
Cost:
$1,500
$380 8,499 $1,940 680 $380
8,499
kWh
$1,940
680
MMBtu
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$770
Cost:
-
$770 17,292 - - $770
17,292
kWh
-
-
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,185
Cost:
$2,850
$1,185 - - - $1,185
-
kWh
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$940
Cost:
$1,950
$680 15,533 $260 90 $680
15,533
kWh
$260
90
MMBtu
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$620
Cost:
$1,620
$450 10,258 $170 59 $450
10,258
kWh
$170
59
MMBtu
TOTAL RECOMMENDED Savings:
$9,705
Cost:
$13,553
$7,335 138,921 $2,370 829 $7,335
138,921
kWh
$2,370
829
MMBtu
TOTAL IMPLEMENTED Savings:
$3,880
Cost:
$5,070
$1,510 34,290 $2,370 829 $1,510
34,290
kWh
$2,370
829
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas