IAC Assessment: KU0489
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0489
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1998
Principal Product plastic injection molded parts
NAICS n/a
SIC 3079 -
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 51,750
Annual Production 2,300 Tons
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $204,515 4,864,009 kWh $0.04
Electricity Demand $63,101 11,100 kW-months/year $5.68
TOTAL ENERGY COSTS $320,055
RECOMMENDED SAVINGS* $39,840 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,770
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,370
Cost:
$15,320
$4,160 99,355 $1,210 213 - - - - - - $4,160
99,355
kWh
$1,210
213
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,520
Cost:
$4,600
$1,090 26,084 $430 76 - - - - - - $1,090
26,084
kWh
$430
76
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,510
Cost:
$2,370
$1,170 28,136 $340 59 - - - - - - $1,170
28,136
kWh
$340
59
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$450
Cost:
$540
$130 2,931 $20 4 - - $300 - - - $130
2,931
kWh
$20
4
kW-months/year
-
-
lb
$300
-
$
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$200
Cost:
$300
$200 4,689 - - - - - - - - $200
4,689
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$23,230
Cost:
$12,470
- - - - $1,570 16,000 $860 - $20,800 - -
-
kWh
-
-
kW-months/year
$1,570
16,000
lb
$860
-
$
$20,800
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$7,560
Cost:
$5,000
- - - - $7,560 180,000 - - - - -
-
kWh
-
-
kW-months/year
$7,560
180,000
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$39,840
Cost:
$40,600
$6,750 161,195 $2,000 352 $9,130 196,000 $1,160 - $20,800 - $6,750
161,195
kWh
$2,000
352
kW-months/year
$9,130
196,000
lb
$1,160
-
$
$20,800
-
$
TOTAL IMPLEMENTED Savings:
$30,770
Cost:
$33,230
$5,580 133,059 $1,660 293 $1,570 16,000 $1,160 - $20,800 - $5,580
133,059
kWh
$1,660
293
kW-months/year
$1,570
16,000
lb
$1,160
-
$
$20,800
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Primary Raw Material