IAC logo
IAC Assessment: LL0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2001
Principal Product metal fab
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 30,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 3,666
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,572 683,920 kWh $0.07
Electricity Demand $14,872 2,974 kW-months/year $5.00
Electricity Fees $1,903 - $ -
Natural Gas $410 33 MMBtu $12.42
TOTAL ENERGY COSTS $67,469
RECOMMENDED SAVINGS* $5,153 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,189
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$646
Cost:
$854
$480 9,371 $141 2 $25 - - - $480
9,371
kWh
$141
2
kW-months/year
$25
-
$
-
-
lb
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$478
Cost:
$1,200
- - $478 8 - - - - -
-
kWh
$478
8
kW-months/year
-
-
$
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,840
Cost:
$6,234
$1,459 28,780 $310 5 $71 - - - $1,459
28,780
kWh
$310
5
kW-months/year
$71
-
$
-
-
lb
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$153
Cost:
$268
$153 2,989 - - - - - - $153
2,989
kWh
-
-
kW-months/year
-
-
$
-
-
lb
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$248
Cost:
$424
$248 4,848 - - - - - - $248
4,848
kWh
-
-
kW-months/year
-
-
$
-
-
lb
06: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$1,788
Cost:
-
- - - - - - $1,788 117,000 -
-
kWh
-
-
kW-months/year
-
-
$
$1,788
117,000
lb
TOTAL RECOMMENDED Savings:
$5,153
Cost:
$8,980
$2,340 45,988 $929 15 $96 - $1,788 117,000 $2,340
45,988
kWh
$929
15
kW-months/year
$96
-
$
$1,788
117,000
lb
TOTAL IMPLEMENTED Savings:
$2,189
Cost:
$692
$401 7,837 - - - - $1,788 117,000 $401
7,837
kWh
-
-
kW-months/year
-
-
$
$1,788
117,000
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz)