Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2003 |
Principal Product | Oil and lubricant addatives |
NAICS | 324191 - Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2992 - Lubricating Oils And Greases |
Sales | $100,000,000-$500,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 4,356,000 |
Annual Production | 70,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Natural Gas | $9,781,506 | 2,756,129 | MMBtu | $3.55 |
TOTAL ENERGY COSTS | $9,781,506 | |||
RECOMMENDED SAVINGS* | $1,406,451 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,341,552 |
#|Description |
Savings Cost |
Status | Natural Gas | Personnel Changes | Ancillary Material Cost | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,037,596 Cost: $14,410 |
$1,037,596 | 292,281 | - | - | - | - |
$1,037,596 292,281 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $295,550 Cost: $63,360 |
$295,550 | 83,253 | - | - | - | - |
$295,550 83,253 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $55,698 Cost: $230,000 |
- | - | - | - | $55,698 | - |
- - MMBtu |
- - $ |
$55,698 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,201 Cost: $3,240 |
$9,201 | 2,143 | - | - | - | - |
$9,201 2,143 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,848 Cost: $3,500 |
$3,813 | 888 | $1,817 | - | $2,218 | - |
$3,813 888 MMBtu |
$1,817 - $ |
$2,218 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $292 Cost: $26 |
$292 | 68 | - | - | - | - |
$292 68 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $266 Cost: $349 |
$266 | 75 | - | - | - | - |
$266 75 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,406,451 Cost: $314,885 |
$1,346,718 | 378,708 | $1,817 | - | $57,916 | - | $1,346,718 378,708 MMBtu |
$1,817 - $ |
$57,916 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,341,552 Cost: $81,645 |
$1,337,517 | 376,565 | $1,817 | - | $2,218 | - | $1,337,517 376,565 MMBtu |
$1,817 - $ |
$2,218 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Personnel Changes | Ancillary Material Cost | Natural Gas | Personnel Changes | Ancillary Material Cost |