IAC Assessment: LL0210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2004
Principal Product ship and repair
NAICS 336612 - Boat Building
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 75,000
Annual Production 10 Pieces
Production Hrs. Annual 5,616
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,007 2,721,619 kWh $0.06
Electricity Demand $62,375 9,287 kW-months/year $6.72
Electricity Fees $7,817 - $ -
Other Gas $9,203 740 MMBtu $12.44
TOTAL ENERGY COSTS $245,402
RECOMMENDED SAVINGS* $148,519 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $135,292
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$104,709
Cost:
$19,500
$101,266 1,660,105 - - $3,443 - - - - - - - $101,266
1,660,105
kWh
-
-
kW-months/year
$3,443
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$24,408
Cost:
$9,920
$23,605 386,966 - - $803 - - - - - - - $23,605
386,966
kWh
-
-
kW-months/year
$803
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$5,147
Cost:
$1,528
- - - - - - $5,147 414 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,147
414
MMBtu
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,154
Cost:
$507
$4,017 65,846 - - $137 - - - - - - - $4,017
65,846
kWh
-
-
kW-months/year
$137
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,533
Cost:
$1,051
$601 9,986 - - $21 - - - $911 - - - $601
9,986
kWh
-
-
kW-months/year
$21
-
$
-
-
MMBtu
$911
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$687
Cost:
$270
$596 9,771 $68 17 $23 - - - - - - - $596
9,771
kWh
$68
17
kW-months/year
$23
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$208
Cost:
$240
$201 3,296 - - $7 - - - - - - - $201
3,296
kWh
-
-
kW-months/year
$7
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$133
Cost:
$90
$129 2,114 - - $4 - - - - - - - $129
2,114
kWh
-
-
kW-months/year
$4
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$7,540
Cost:
$560
- - - - - - - - $5,040 - $2,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,040
-
$
$2,500
-
$
TOTAL RECOMMENDED Savings:
$148,519
Cost:
$33,666
$130,415 2,138,084 $68 17 $4,438 - $5,147 414 $5,951 - $2,500 - $130,415
2,138,084
kWh
$68
17
kW-months/year
$4,438
-
$
$5,147
414
MMBtu
$5,951
-
$
$2,500
-
$
TOTAL IMPLEMENTED Savings:
$135,292
Cost:
$31,548
$125,797 2,062,252 $68 17 $4,280 - $5,147 414 - - - - $125,797
2,062,252
kWh
$68
17
kW-months/year
$4,280
-
$
$5,147
414
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Other Gas Personnel Changes One-time Revenue or Avoided Cost