Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2004 |
Principal Product | oil and gas production |
NAICS | 211111 - Crude Petroleum and Natural Gas Extraction |
SIC | 1311 - Crude Petroleum And Natural Gas |
Sales | $100,000,000-$500,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 85,000 |
Annual Production | 21,900,000 BBL |
Production Hrs. Annual | 8,760 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Natural Gas | $2,000,000 | 1,002,103 | MMBtu | $2.00 |
TOTAL ENERGY COSTS | $2,000,000 | |||
RECOMMENDED SAVINGS* | $677,100 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $570,749 |
#|Description |
Savings Cost |
Status | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $479,962 Cost: $1,400,000 |
$479,962 | 239,981 | - | - | - | - |
$479,962 239,981 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL |
Savings: $55,846 Cost: $100,000 |
$55,846 | 27,923 | - | - | - | - |
$55,846 27,923 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2693 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION |
Savings: $47,454 Cost: $108,000 |
$47,454 | 23,727 | - | - | - | - |
$47,454 23,727 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,231 Cost: $4,806 |
$5,606 | 2,803 | $5,625 | - | - | - |
$5,606 2,803 MMBtu |
$5,625 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,028 Cost: $1,485 |
$6,028 | 3,014 | - | - | - | - |
$6,028 3,014 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,862 Cost: $6,160 |
$4,862 | 2,431 | - | - | - | - |
$4,862 2,431 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,051 Cost: $2,550 |
$684 | 352 | $2,367 | - | - | - |
$684 352 MMBtu |
$2,367 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,146 Cost: $492 |
$1,146 | 573 | - | - | - | - |
$1,146 573 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $67,520 Cost: $4,000 |
- | - | $64,020 | - | $3,500 | - |
- - MMBtu |
$64,020 - $ |
$3,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $677,100 Cost: $1,627,493 |
$601,588 | 300,804 | $72,012 | - | $3,500 | - | $601,588 300,804 MMBtu |
$72,012 - $ |
$3,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $570,749 Cost: $1,416,943 |
$497,604 | 248,802 | $69,645 | - | $3,500 | - | $497,604 248,802 MMBtu |
$69,645 - $ |
$3,500 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |