Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2006 |
Principal Product | Chicken processing |
NAICS | 311615 - Poultry Processing |
SIC | 2015 - Poultry Slaughtering And Processing |
Sales | $50,000,000-$100,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 1,000,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $678,312 | 11,422,466 | kWh | $0.06 |
Electricity Fees | $25,080 | - | $ | - |
Natural Gas | $748,308 | 67,524 | MMBtu | $11.08 |
TOTAL ENERGY COSTS | $1,451,700 | |||
RECOMMENDED SAVINGS* | $213,959 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,326 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $76,757 Cost: $77,280 |
- | - | - | - | $76,757 | 5,616 | - | - |
- - kWh |
- - $ |
$76,757 5,616 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $72,962 Cost: $24,500 |
- | - | - | - | $72,962 | 6,584 | - | - |
- - kWh |
- - $ |
$72,962 6,584 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $32,476 Cost: $8,296 |
$31,317 | 527,218 | $1,159 | - | - | - | - | - |
$31,317 527,218 kWh |
$1,159 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $16,453 Cost: $19,600 |
- | - | - | - | $16,453 | 1,485 | - | - |
- - kWh |
- - $ |
$16,453 1,485 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,985 Cost: $30 |
$4,807 | 80,926 | $178 | - | - | - | - | - |
$4,807 80,926 kWh |
$178 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,638 Cost: $1,520 |
$4,473 | 75,299 | $165 | - | - | - | - | - |
$4,473 75,299 kWh |
$165 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,853 Cost: $1,320 |
$3,716 | 62,557 | $137 | - | - | - | - | - |
$3,716 62,557 kWh |
$137 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $844 Cost: $700 |
$163 | 2,742 | $6 | - | - | - | $675 | - |
$163 2,742 kWh |
$6 - $ |
- - MMBtu |
$675 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $747 Cost: $69 |
$720 | 12,113 | $27 | - | - | - | - | - |
$720 12,113 kWh |
$27 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $244 Cost: $30 |
$235 | 3,963 | $9 | - | - | - | - | - |
$235 3,963 kWh |
$9 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $213,959 Cost: $133,345 |
$45,431 | 764,818 | $1,681 | - | $166,172 | 13,685 | $675 | - | $45,431 764,818 kWh |
$1,681 - $ |
$166,172 13,685 MMBtu |
$675 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,326 Cost: $3,639 |
$9,307 | 156,674 | $344 | - | - | - | $675 | - | $9,307 156,674 kWh |
$344 - $ |
- - MMBtu |
$675 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes |