IAC logo
IAC Assessment: LL0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2009
Principal Product Electronic switch grear
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 70,000
Annual Production 150,000 Pieces
Production Hrs. Annual 4,000
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,348 1,040,460 kWh $0.08
Electricity Fees $8,546 - $ -
TOTAL ENERGY COSTS $94,894
RECOMMENDED SAVINGS* $14,072 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,618
#|Description Savings
Cost
Status Electricity Usage Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,852
Cost:
$5,555
$8,965 108,019 $887 - - - $8,965
108,019
kWh
$887
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,129
Cost:
$30
$1,937 23,936 $192 - - - $1,937
23,936
kWh
$192
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$876
Cost:
$198
$797 9,601 $79 - - - $797
9,601
kWh
$79
-
$
-
-
$
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$637
Cost:
$623
$580 6,989 $57 - - - $580
6,989
kWh
$57
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$335
Cost:
$90
$305 3,673 $30 - - - $305
3,673
kWh
$30
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$243
Cost:
$140
$111 1,332 $11 - $121 - $111
1,332
kWh
$11
-
$
$121
-
$
TOTAL RECOMMENDED Savings:
$14,072
Cost:
$6,636
$12,695 153,550 $1,256 - $121 - $12,695
153,550
kWh
$1,256
-
$
$121
-
$
TOTAL IMPLEMENTED Savings:
$12,618
Cost:
$6,208
$11,482 138,944 $1,136 - - - $11,482
138,944
kWh
$1,136
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Fees One-time Revenue or Avoided Cost