IAC logo
IAC Assessment: LL0326
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0326
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2010
Principal Product Electric connectors
NAICS 334417 - Electronic Connector Manufacturing
SIC 3678 - Electronic Connectors
Sales $100,000,000-$500,000,000
# of Employees 900
Plant Area (Sq.Ft.) 400,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,059,625 31,877,600 kWh $0.06
Natural Gas $93,688 8,664 MMBtu $10.81
TOTAL ENERGY COSTS $2,153,313
RECOMMENDED SAVINGS* $92,942 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,071
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$44,220
Cost:
$15,480
$44,220 684,409 - - - - $44,220
684,409
kWh
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$31,166
Cost:
$6,970
$31,166 482,364 - - - - $31,166
482,364
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,685
Cost:
$3,250
- - $13,685 1,266 - - -
-
kWh
$13,685
1,266
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,178
Cost:
$1,470
$903 13,981 - - $1,275 - $903
13,981
kWh
-
-
MMBtu
$1,275
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$1,693
Cost:
$2,340
$1,693 26,208 - - - - $1,693
26,208
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$92,942
Cost:
$29,510
$77,982 1,206,962 $13,685 1,266 $1,275 - $77,982
1,206,962
kWh
$13,685
1,266
MMBtu
$1,275
-
$
TOTAL IMPLEMENTED Savings:
$89,071
Cost:
$25,700
$75,386 1,166,773 $13,685 1,266 - - $75,386
1,166,773
kWh
$13,685
1,266
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes