IAC logo
IAC Assessment: LM0004
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0004
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product electronic chasis
NAICS n/a
SIC 3423 - Hand And Edge Tools, Nec
Sales $1,000,000-$5,000,000
# of Employees 42
Plant Area (Sq.Ft.) 39,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,210
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,673 504,040 kWh $0.06
Electricity Demand $39,620 3,924 kW-months/year $10.10
Electricity Fees $12,097 - $ -
Natural Gas $2,700 275 MMBtu $9.82
TOTAL ENERGY COSTS $86,090
RECOMMENDED SAVINGS* $310,624 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,013
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7145 INSTALL SKYLIGHTS Savings:
$8,789
Cost:
$8,500
$4,301 61,880 $4,488 408 - - - - $4,301
61,880
kWh
$4,488
408
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,547
Cost:
$725
$2,748 39,536 $2,359 215 $(-1,560) - - - $2,748
39,536
kWh
$2,359
215
kW-months/year
$(-1,560)
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$910
Cost:
$1,530
$514 7,390 $396 36 - - - - $514
7,390
kWh
$396
36
kW-months/year
-
-
$
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$8,492
Cost:
$1,950
- - $8,492 - - - - - -
-
kWh
$8,492
-
kW-months/year
-
-
$
-
-
$
05: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$3,420
Cost:
$1,000
- - - - $3,420 - - - -
-
kWh
-
-
kW-months/year
$3,420
-
$
-
-
$
06: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$666
Cost:
$1,000
- - - - - - $666 - -
-
kWh
-
-
kW-months/year
-
-
$
$666
-
$
07: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES Savings:
$44,800
Cost:
$1,000
- - - - - - $44,800 - -
-
kWh
-
-
kW-months/year
-
-
$
$44,800
-
$
08: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$240,000
Cost:
$25,000
- - - - - - $240,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$240,000
-
$
TOTAL RECOMMENDED Savings:
$310,624
Cost:
$40,705
$7,563 108,806 $15,735 659 $1,860 - $285,466 - $7,563
108,806
kWh
$15,735
659
kW-months/year
$1,860
-
$
$285,466
-
$
TOTAL IMPLEMENTED Savings:
$49,013
Cost:
$2,725
$2,748 39,536 $2,359 215 $(-1,560) - $45,466 - $2,748
39,536
kWh
$2,359
215
kW-months/year
$(-1,560)
-
$
$45,466
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes