IAC Assessment: LM0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product composite products for medical and aerospace
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 40,000
Annual Production 5,000 Pieces
Production Hrs. Annual 4,590
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $75,998 1,003,094 kWh $0.08
Electricity Demand $35,364 4,386 kW-months/year $8.06
Electricity Fees $2,564 - $ -
Natural Gas $6,414 943 MMBtu $6.80
TOTAL ENERGY COSTS $128,838
RECOMMENDED SAVINGS* $100,149 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,617
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ %
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,800
Cost:
$225
- - - - - - $14,800 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$14,800
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,389
Cost:
$450
$4,664 60,510 $725 91 - - - - - - $4,664
60,510
kWh
$725
91
kW-months/year
-
-
$
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,601
Cost:
-
$1,352 17,525 $249 31 - - - - - - $1,352
17,525
kWh
$249
31
kW-months/year
-
-
$
-
-
$
-
-
%
04: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$8,671
Cost:
$13,000
$7,099 92,081 $1,572 197 - - - - - - $7,099
92,081
kWh
$1,572
197
kW-months/year
-
-
$
-
-
$
-
-
%
05: 2.7145 INSTALL SKYLIGHTS Savings:
$952
Cost:
$2,000
$568 7,368 $384 48 - - - - - - $568
7,368
kWh
$384
48
kW-months/year
-
-
$
-
-
$
-
-
%
06: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$11,340
Cost:
$1,000
- - - - $11,340 - - - - - -
-
kWh
-
-
kW-months/year
$11,340
-
$
-
-
$
-
-
%
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$48,228
Cost:
$25,000
- - - - - - - - $48,228 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$48,228
-
%
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$9,168
Cost:
$1,961
- - - - $9,168 - - - - - -
-
kWh
-
-
kW-months/year
$9,168
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$100,149
Cost:
$43,636
$13,683 177,484 $2,930 367 $20,508 - $14,800 - $48,228 - $13,683
177,484
kWh
$2,930
367
kW-months/year
$20,508
-
$
$14,800
-
$
$48,228
-
%
TOTAL IMPLEMENTED Savings:
$53,617
Cost:
$25,450
$4,664 60,510 $725 91 - - - - $48,228 - $4,664
60,510
kWh
$725
91
kW-months/year
-
-
$
-
-
$
$48,228
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Administrative Changes Increase in Production