Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2001 |
Principal Product | composite products for medical and aerospace |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 40,000 |
Annual Production | 5,000 Pieces |
Production Hrs. Annual | 4,590 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $75,998 | 1,003,094 | kWh | $0.08 |
Electricity Demand | $35,364 | 4,386 | kW-months/year | $8.06 |
Electricity Fees | $2,564 | - | $ | - |
Natural Gas | $6,414 | 943 | MMBtu | $6.80 |
TOTAL ENERGY COSTS | $128,838 | |||
RECOMMENDED SAVINGS* | $100,149 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $53,617 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $14,800 Cost: $225 |
- | - | - | - | - | - | $14,800 | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$14,800 - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,389 Cost: $450 |
$4,664 | 60,510 | $725 | 91 | - | - | - | - | - | - |
$4,664 60,510 kWh |
$725 91 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,601 Cost: - |
$1,352 | 17,525 | $249 | 31 | - | - | - | - | - | - |
$1,352 17,525 kWh |
$249 31 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN |
Savings: $8,671 Cost: $13,000 |
$7,099 | 92,081 | $1,572 | 197 | - | - | - | - | - | - |
$7,099 92,081 kWh |
$1,572 197 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7145 INSTALL SKYLIGHTS |
Savings: $952 Cost: $2,000 |
$568 | 7,368 | $384 | 48 | - | - | - | - | - | - |
$568 7,368 kWh |
$384 48 kW-months/year |
- - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $11,340 Cost: $1,000 |
- | - | - | - | $11,340 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$11,340 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $48,228 Cost: $25,000 |
- | - | - | - | - | - | - | - | $48,228 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - $ |
$48,228 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $9,168 Cost: $1,961 |
- | - | - | - | $9,168 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,168 - $ |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $100,149 Cost: $43,636 |
$13,683 | 177,484 | $2,930 | 367 | $20,508 | - | $14,800 | - | $48,228 | - | $13,683 177,484 kWh |
$2,930 367 kW-months/year |
$20,508 - $ |
$14,800 - $ |
$48,228 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $53,617 Cost: $25,450 |
$4,664 | 60,510 | $725 | 91 | - | - | - | - | $48,228 | - | $4,664 60,510 kWh |
$725 91 kW-months/year |
- - $ |
- - $ |
$48,228 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Increase in Production |