IAC logo
IAC Assessment: LM0009
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0009
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product control valves
NAICS n/a
SIC 3822 - Environmental Controls
Sales $100,000,000-$500,000,000
# of Employees 322
Plant Area (Sq.Ft.) 232,525
Annual Production 7,000,000 Pieces
Production Hrs. Annual 4,800
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $465,370 8,266,369 kWh $0.06
Electricity Demand $254,501 34,812 kW-months/year $7.31
Electricity Fees $92,368 - $ -
Natural Gas $166,985 12,108 MMBtu $13.79
TOTAL ENERGY COSTS $979,224
RECOMMENDED SAVINGS* $1,543,824 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$35,795
Cost:
$195
$30,489 250,031 $6,086 416 $(-780) - - - $30,489
250,031
kWh
$6,086
416
kW-months/year
$(-780)
-
$
-
-
$
02: 2.7145 INSTALL SKYLIGHTS Savings:
$36,728
Cost:
$66,000
$36,728 275,940 - - - - - - $36,728
275,940
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,805
Cost:
$12,000
$6,258 36,720 $2,547 254 - - - - $6,258
36,720
kWh
$2,547
254
kW-months/year
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$95,096
Cost:
$450
- - - - - - $95,096 - -
-
kWh
-
-
kW-months/year
-
-
$
$95,096
-
$
05: 4.1260 INSTALL SENSORS TO DETECT DEFECTS Savings:
$1,277,400
Cost:
$300,000
- - - - $1,277,400 - - - -
-
kWh
-
-
kW-months/year
$1,277,400
-
$
-
-
$
06: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$90,000
Cost:
$45,696
- - - - $90,000 - - - -
-
kWh
-
-
kW-months/year
$90,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,543,824
Cost:
$424,341
$73,475 562,691 $8,633 670 $1,366,620 - $95,096 - $73,475
562,691
kWh
$8,633
670
kW-months/year
$1,366,620
-
$
$95,096
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes