IAC logo
IAC Assessment: LM0019
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0019
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product tire replacement products
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 77
Plant Area (Sq.Ft.) 95,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 3,254
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $334,782 6,933,064 kWh $0.05
Electricity Demand $232,396 44,388 kW-months/year $5.24
Electricity Fees $67,891 - $ -
Natural Gas $94,179 8,733 MMBtu $10.78
TOTAL ENERGY COSTS $729,248
RECOMMENDED SAVINGS* $27,183 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,087
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$425
Cost:
$418
$331 3,177 $94 12 - - - - $331
3,177
kWh
$94
12
kW-months/year
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,586
Cost:
$240
$9,774 93,891 $2,812 347 - - - - $9,774
93,891
kWh
$2,812
347
kW-months/year
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,085
Cost:
$2,482
$841 8,077 $244 30 - - - - $841
8,077
kWh
$244
30
kW-months/year
-
-
$
-
-
$
04: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$3,087
Cost:
$450
- - - - $3,087 - - - -
-
kWh
-
-
kW-months/year
$3,087
-
$
-
-
$
05: 4.3230 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS Savings:
$10,000
Cost:
$3,000
- - - - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$10,000
-
$
TOTAL RECOMMENDED Savings:
$27,183
Cost:
$6,590
$10,946 105,145 $3,150 389 $3,087 - $10,000 - $10,946
105,145
kWh
$3,150
389
kW-months/year
$3,087
-
$
$10,000
-
$
TOTAL IMPLEMENTED Savings:
$13,087
Cost:
$3,450
- - - - $3,087 - $10,000 - -
-
kWh
-
-
kW-months/year
$3,087
-
$
$10,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes