IAC logo
IAC Assessment: LM0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2001
Principal Product fabric
NAICS n/a
SIC 2261 - Finishing Plants, Cotton
Sales $50,000,000-$100,000,000
# of Employees 370
Plant Area (Sq.Ft.) 217,000
Annual Production 78,000 Thousand Feet
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $630,311 12,206,636 kWh $0.05
Electricity Demand $298,736 86,496 kW-months/year $3.45
Electricity Fees $208,109 - $ -
TOTAL ENERGY COSTS $1,679,076
RECOMMENDED SAVINGS* $292,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,465
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,082
Cost:
$857
$1,746 18,477 $336 32 - - - - $1,746
18,477
kWh
$336
32
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$40,680
Cost:
$48,707
$28,253 307,316 $12,427 1,188 - - - - $28,253
307,316
kWh
$12,427
1,188
kW-months/year
-
-
$
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,649
Cost:
$6,000
$2,005 12,150 $644 67 - - - - $2,005
12,150
kWh
$644
67
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$29,054
Cost:
$400
$24,830 277,124 $5,006 485 $(-782) - - - $24,830
277,124
kWh
$5,006
485
kW-months/year
$(-782)
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,216
Cost:
$228
$1,844 20,575 $372 36 - - - - $1,844
20,575
kWh
$372
36
kW-months/year
-
-
$
-
-
$
06: 2.4237 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING Savings:
$12,450
Cost:
$250
$10,254 114,813 $2,196 212 - - - - $10,254
114,813
kWh
$2,196
212
kW-months/year
-
-
$
-
-
$
07: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$203,861
Cost:
$40,400
- - - - - - $203,861 - -
-
kWh
-
-
kW-months/year
-
-
$
$203,861
-
$
TOTAL RECOMMENDED Savings:
$292,992
Cost:
$96,842
$68,932 750,455 $20,981 2,020 $(-782) - $203,861 - $68,932
750,455
kWh
$20,981
2,020
kW-months/year
$(-782)
-
$
$203,861
-
$
TOTAL IMPLEMENTED Savings:
$74,465
Cost:
$55,964
$56,834 615,067 $18,413 1,772 $(-782) - - - $56,834
615,067
kWh
$18,413
1,772
kW-months/year
$(-782)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes