IAC logo
IAC Assessment: LM0042
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0042
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2002
Principal Product corrugated containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 192,000
Annual Production 800,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $443,050 4,457,228 kWh $0.10
Electricity Demand $141,910 11,004 kW-months/year $12.90
Electricity Fees $(-173,338) - $ -
Natural Gas $87,492 37,049 MMBtu $2.36
TOTAL ENERGY COSTS $499,114
RECOMMENDED SAVINGS* $132,874 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,950
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$646
Cost:
$193
$525 4,723 $121 9 - - - - $525
4,723
kWh
$121
9
kW-months/year
-
-
MMBtu
-
-
%
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,591
Cost:
$438
$1,342 12,073 $249 19 - - - - $1,342
12,073
kWh
$249
19
kW-months/year
-
-
MMBtu
-
-
%
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$899
Cost:
$169
$729 6,564 $170 13 - - - - $729
6,564
kWh
$170
13
kW-months/year
-
-
MMBtu
-
-
%
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$713
Cost:
$806
- - - - $713 302 - - -
-
kWh
-
-
kW-months/year
$713
302
MMBtu
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$84,270
Cost:
$45,600
$68,412 615,600 $15,858 1,231 - - - - $68,412
615,600
kWh
$15,858
1,231
kW-months/year
-
-
MMBtu
-
-
%
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$44,755
Cost:
$30,000
- - - - - - $44,755 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$44,755
-
%
TOTAL RECOMMENDED Savings:
$132,874
Cost:
$77,206
$71,008 638,960 $16,398 1,272 $713 302 $44,755 - $71,008
638,960
kWh
$16,398
1,272
kW-months/year
$713
302
MMBtu
$44,755
-
%
TOTAL IMPLEMENTED Savings:
$2,950
Cost:
$1,437
$1,867 16,796 $370 28 $713 302 - - $1,867
16,796
kWh
$370
28
kW-months/year
$713
302
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production