IAC logo
IAC Assessment: LM0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product pharmaceutical products
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2836 - Biological Products Exc. Diagnostic
Sales $100,000,000-$500,000,000
# of Employees 240
Plant Area (Sq.Ft.) 134,000
Annual Production 2,400,000 Pieces
Production Hrs. Annual 8,400
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,477,174 68,956,970 kWh $0.02
Electricity Demand $331,384 24,384 kW-months/year $13.59
Electricity Fees $8,324 - $ -
Natural Gas $322,154 54,232 MMBtu $5.94
TOTAL ENERGY COSTS $2,139,036
RECOMMENDED SAVINGS* $616,603 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $288,127
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Increase in Production
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$232
Cost:
$20
$196 1,848 $36 2 - - - - - - - - $196
1,848
kWh
$36
2
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,316
Cost:
$1,380
$2,813 26,489 $503 38 - - - - - - - - $2,813
26,489
kWh
$503
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,794
Cost:
$516
$4,447 41,720 $347 47 - - - - - - - - $4,447
41,720
kWh
$347
47
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,296
Cost:
$792
$1,066 10,036 $230 18 - - - - - - - - $1,066
10,036
kWh
$230
18
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$13,658
Cost:
$360
$10,240 94,128 $3,418 282 - - - - - - - - $10,240
94,128
kWh
$3,418
282
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,314
Cost:
-
$4,239 35,653 $1,075 119 - - - - - - - - $4,239
35,653
kWh
$1,075
119
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,760
Cost:
$521
$2,029 19,078 $731 56 - - - - - - - - $2,029
19,078
kWh
$731
56
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,802
Cost:
$17,200
- - - - $5,802 1,737 - - - - - - -
-
kWh
-
-
kW-months/year
$5,802
1,737
MMBtu
-
-
$
-
-
Tgal
-
-
%
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$17,717
Cost:
$120
$17,717 199,400 - - - - - - - - - - $17,717
199,400
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
-
-
%
10: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$40,647
Cost:
$5,000
$27,657 260,400 $7,146 546 - - - - $5,844 - - - $27,657
260,400
kWh
$7,146
546
kW-months/year
-
-
MMBtu
-
-
$
$5,844
-
Tgal
-
-
%
11: 4.4220 UTILIZE OUTSIDE CONTRACTING Savings:
$56,838
Cost:
$11,800
- - - - - - $56,838 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$56,838
-
$
-
-
Tgal
-
-
%
12: 4.4220 UTILIZE OUTSIDE CONTRACTING Savings:
$234,229
Cost:
$100,000
- - - - - - $234,229 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$234,229
-
$
-
-
Tgal
-
-
%
13: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$230,000
Cost:
$336,269
- - - - - - - - - - $230,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
$230,000
-
%
TOTAL RECOMMENDED Savings:
$616,603
Cost:
$473,978
$70,404 688,752 $13,486 1,108 $5,802 1,737 $291,067 - $5,844 - $230,000 - $70,404
688,752
kWh
$13,486
1,108
kW-months/year
$5,802
1,737
MMBtu
$291,067
-
$
$5,844
-
Tgal
$230,000
-
%
TOTAL IMPLEMENTED Savings:
$288,127
Cost:
$344,478
$42,251 393,376 $10,032 824 - - - - $5,844 - $230,000 - $42,251
393,376
kWh
$10,032
824
kW-months/year
-
-
MMBtu
-
-
$
$5,844
-
Tgal
$230,000
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal $ %
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Increase in Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Increase in Production