IAC Assessment: LM0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product fabrication of dies, jigs, and tools
NAICS 333514 - Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 42,500
Annual Production 1,162 Pieces
Production Hrs. Annual 5,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,796 1,191,900 kWh $0.12
Electricity Demand $34,639 7,848 kW-months/year $4.41
Electricity Fees $4,973 - $ -
Natural Gas $1,307 164 MMBtu $7.97
TOTAL ENERGY COSTS $185,715
RECOMMENDED SAVINGS* $590,592 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production
$ kWh $ kW-months/year $ $ $ %
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$584
Cost:
$767
$482 4,033 $102 13 - - - - $482
4,033
kWh
$102
13
kW-months/year
-
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,644
Cost:
$500
$8,046 67,260 $1,286 161 $(-688) - - - $8,046
67,260
kWh
$1,286
161
kW-months/year
$(-688)
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,526
Cost:
-
$2,239 18,031 $287 43 - - - - $2,239
18,031
kWh
$287
43
kW-months/year
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,935
Cost:
$2,250
$2,530 21,150 $405 51 - - - - $2,530
21,150
kWh
$405
51
kW-months/year
-
-
$
-
-
%
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$14,728
Cost:
$1,000
$14,728 113,400 - - - - - - $14,728
113,400
kWh
-
-
kW-months/year
-
-
$
-
-
%
06: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$198,375
Cost:
$32,670
- - - - $198,375 - - - -
-
kWh
-
-
kW-months/year
$198,375
-
$
-
-
%
07: 4.7310 ADVERTISE PRODUCT OR SERVICE Savings:
$242,800
Cost:
$2,000
- - - - - - $242,800 - -
-
kWh
-
-
kW-months/year
-
-
$
$242,800
-
%
08: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$120,000
Cost:
$7,997
- - - - - - $120,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$120,000
-
%
TOTAL RECOMMENDED Savings:
$590,592
Cost:
$47,184
$28,025 223,874 $2,080 268 $197,687 - $362,800 - $28,025
223,874
kWh
$2,080
268
kW-months/year
$197,687
-
$
$362,800
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Increase in Production Electricity Usage Electricity Demand Personnel Changes Increase in Production