Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2003 |
Principal Product | transformers |
NAICS | 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3677 - Electronic Coils And Transformers |
Sales | $1,000,000-$5,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 28,000 |
Annual Production | 14,400 Pieces |
Production Hrs. Annual | 2,250 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $65,486 | 547,440 | kWh | $0.12 |
Electricity Demand | $15,520 | 1,884 | kW-months/year | $8.24 |
Electricity Fees | $5,322 | - | $ | - |
Natural Gas | $2,779 | 431 | MMBtu | $6.45 |
TOTAL ENERGY COSTS | $89,107 | |||
RECOMMENDED SAVINGS* | $108,064 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $1,027 Cost: - |
$793 | 6,120 | $234 | 32 | - | - | - | - |
$793 6,120 kWh |
$234 32 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,855 Cost: $6,210 |
$2,205 | 17,010 | $650 | 91 | - | - | - | - |
$2,205 17,010 kWh |
$650 91 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $34 Cost: - |
$26 | 197 | $8 | 1 | - | - | - | - |
$26 197 kWh |
$8 1 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,585 Cost: $3,275 |
$1,238 | 9,553 | $347 | 48 | - | - | - | - |
$1,238 9,553 kWh |
$347 48 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $64,652 Cost: $4,768 |
- | - | - | - | $64,652 | - | - | - |
- - kWh |
- - kW-months/year |
$64,652 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $37,911 Cost: $24,550 |
- | - | - | - | - | - | $37,911 | - |
- - kWh |
- - kW-months/year |
- - $ |
$37,911 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $108,064 Cost: $38,803 |
$4,262 | 32,880 | $1,239 | 172 | $64,652 | - | $37,911 | - | $4,262 32,880 kWh |
$1,239 172 kW-months/year |
$64,652 - $ |
$37,911 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes |