IAC logo
IAC Assessment: LM0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2003
Principal Product transformers
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677 - Electronic Coils And Transformers
Sales $1,000,000-$5,000,000
# of Employees 80
Plant Area (Sq.Ft.) 28,000
Annual Production 14,400 Pieces
Production Hrs. Annual 2,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,486 547,440 kWh $0.12
Electricity Demand $15,520 1,884 kW-months/year $8.24
Electricity Fees $5,322 - $ -
Natural Gas $2,779 431 MMBtu $6.45
TOTAL ENERGY COSTS $89,107
RECOMMENDED SAVINGS* $108,064 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,027
Cost:
-
$793 6,120 $234 32 - - - - $793
6,120
kWh
$234
32
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,855
Cost:
$6,210
$2,205 17,010 $650 91 - - - - $2,205
17,010
kWh
$650
91
kW-months/year
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$34
Cost:
-
$26 197 $8 1 - - - - $26
197
kWh
$8
1
kW-months/year
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,585
Cost:
$3,275
$1,238 9,553 $347 48 - - - - $1,238
9,553
kWh
$347
48
kW-months/year
-
-
$
-
-
$
05: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$64,652
Cost:
$4,768
- - - - $64,652 - - - -
-
kWh
-
-
kW-months/year
$64,652
-
$
-
-
$
06: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$37,911
Cost:
$24,550
- - - - - - $37,911 - -
-
kWh
-
-
kW-months/year
-
-
$
$37,911
-
$
TOTAL RECOMMENDED Savings:
$108,064
Cost:
$38,803
$4,262 32,880 $1,239 172 $64,652 - $37,911 - $4,262
32,880
kWh
$1,239
172
kW-months/year
$64,652
-
$
$37,911
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes