IAC logo
IAC Assessment: LM0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2004
Principal Product Egg Flats
NAICS 322299 - All Other Converted Paper Product Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 50,600
Annual Production 5,500 Tons
Production Hrs. Annual 8,280
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,000 2,509,028 kWh $0.07
Electricity Demand $32,049 4,872 kW-months/year $6.58
Electricity Fees $(-85,848) - $ -
Natural Gas $389,504 56,742 MMBtu $6.86
TOTAL ENERGY COSTS $508,705
RECOMMENDED SAVINGS* $18,703 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,984
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
01: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$528
Cost:
$25
- - - - $307 45 $172 132 $49 - - - -
-
kWh
-
-
kW-months/year
$307
45
MMBtu
$172
132
Tgal
$49
-
gal
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,952
Cost:
$1,300
$2,653 31,417 $299 46 - - - - - - - - $2,653
31,417
kWh
$299
46
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$255
Cost:
$281
$222 2,622 $33 2 - - - - - - - - $222
2,622
kWh
$33
2
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,953
Cost:
$3,825
$4,592 37,890 $361 55 - - - - - - - - $4,592
37,890
kWh
$361
55
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$6,736
Cost:
$2,500
- - - - $6,736 992 - - - - - - -
-
kWh
-
-
kW-months/year
$6,736
992
MMBtu
-
-
Tgal
-
-
gal
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$1,766
Cost:
$1,500
- - - - - - - - - - $1,766 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$1,766
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,513
Cost:
$880
$1,513 17,918 - - - - - - - - - - $1,513
17,918
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$18,703
Cost:
$10,311
$8,980 89,847 $693 103 $7,043 1,037 $172 132 $49 - $1,766 - $8,980
89,847
kWh
$693
103
kW-months/year
$7,043
1,037
MMBtu
$172
132
Tgal
$49
-
gal
$1,766
-
$
TOTAL IMPLEMENTED Savings:
$11,984
Cost:
$4,986
$4,388 51,957 $332 48 $7,043 1,037 $172 132 $49 - - - $4,388
51,957
kWh
$332
48
kW-months/year
$7,043
1,037
MMBtu
$172
132
Tgal
$49
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes