Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2005
Principal Product metal forming
NAICS 332439 - Other Metal Container Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 79,000
Annual Production 26,400 Pieces
Production Hrs. Annual 4,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,170 679,200 kWh $0.10
Electricity Demand $19,020 2,244 kW-months/year $8.48
Electricity Fees $(-2,636) - $ -
Natural Gas $67,242 8,758 MMBtu $7.68
TOTAL ENERGY COSTS $153,796
RECOMMENDED SAVINGS* $13,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,975
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,003
Cost:
$300
$1,682 15,457 $321 46 - - $1,682
15,457
kWh
$321
46
kW-months/year
-
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$991
Cost:
$250
$832 7,770 $159 23 - - $832
7,770
kWh
$159
23
kW-months/year
-
-
Tgal
03: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$7,975
Cost:
$3,000
$(-4,025) (-37,575) - - $12,000 - $(-4,025)
(-37,575)
kWh
-
-
kW-months/year
$12,000
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,349
Cost:
-
$1,972 18,414 $377 54 - - $1,972
18,414
kWh
$377
54
kW-months/year
-
-
Tgal
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$82
Cost:
$126
$69 641 $13 2 - - $69
641
kWh
$13
2
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$13,400
Cost:
$3,676
$530 4,707 $870 125 $12,000 - $530
4,707
kWh
$870
125
kW-months/year
$12,000
-
Tgal
TOTAL IMPLEMENTED Savings:
$7,975
Cost:
$3,000
$(-4,025) (-37,575) - - $12,000 - $(-4,025)
(-37,575)
kWh
-
-
kW-months/year
$12,000
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal