Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product lead battery plates
NAICS 335911 - Storage Battery Manufacturing
SIC 3691 - Storage Batteries
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 44,000
Annual Production 1,700,000 Pieces
Production Hrs. Annual 8,160
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $680,052 7,717,692 kWh $0.09
Electricity Demand $1,818,927 11,882 kW-months/year $153.08
Electricity Fees $45,164 - $ -
Natural Gas $507,043 67,500 MMBtu $7.51
TOTAL ENERGY COSTS $3,051,186
RECOMMENDED SAVINGS* $562,031 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $160,407
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,799
Cost:
$90,000
$5,094 75,725 $1,705 111 - - - - $5,094
75,725
kWh
$1,705
111
kW-months/year
-
-
MMBtu
-
-
%
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,085
Cost:
$5,844
$3,935 58,500 $2,150 140 - - - - $3,935
58,500
kWh
$2,150
140
kW-months/year
-
-
MMBtu
-
-
%
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$116,775
Cost:
$100,000
$(-4,095) (-60,874) $1,371 (-90) $119,499 15,912 - - $(-4,095)
(-60,874)
kWh
$1,371
(-90)
kW-months/year
$119,499
15,912
MMBtu
-
-
%
04: 2.1117 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION Savings:
$85,569
Cost:
$90,000
- - - - $85,569 11,394 - - -
-
kWh
-
-
kW-months/year
$85,569
11,394
MMBtu
-
-
%
05: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$193,195
Cost:
$15,800
$86,528 1,286,282 - - - - $106,667 - $86,528
1,286,282
kWh
-
-
kW-months/year
-
-
MMBtu
$106,667
-
%
06: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$153,608
Cost:
$23,700
$41,534 617,417 - - $40,554 5,400 $71,520 - $41,534
617,417
kWh
-
-
kW-months/year
$40,554
5,400
MMBtu
$71,520
-
%
TOTAL RECOMMENDED Savings:
$562,031
Cost:
$325,344
$132,996 1,977,050 $5,226 161 $245,622 32,706 $178,187 - $132,996
1,977,050
kWh
$5,226
161
kW-months/year
$245,622
32,706
MMBtu
$178,187
-
%
TOTAL IMPLEMENTED Savings:
$160,407
Cost:
$113,700
$46,628 693,142 $1,705 111 $40,554 5,400 $71,520 - $46,628
693,142
kWh
$1,705
111
kW-months/year
$40,554
5,400
MMBtu
$71,520
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Natural Gas Increase in Production Electricity Usage Electricity Demand Natural Gas Increase in Production