IAC logo
IAC Assessment: LM0119
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LM0119
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Loyola Marymount University
Assessment Year 2006
Principal Product in fact, it
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $100,000,000-$500,000,000
# of Employees 3,200
Plant Area (Sq.Ft.) 1,500,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 2,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,628,386 56,326,250 kWh $0.08
Natural Gas $569,438 95,081 MMBtu $5.99
TOTAL ENERGY COSTS $5,197,824
RECOMMENDED SAVINGS* $3,475,045 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,375,000
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$500
Cost:
$374
$500 6,085 - - $500
6,085
kWh
-
-
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$746
Cost:
-
$746 9,083 - - $746
9,083
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$859
Cost:
$100
- - $859 107 -
-
kWh
$859
107
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$58,500
Cost:
$160,200
$58,500 712,000 - - $58,500
712,000
kWh
-
-
MMBtu
05: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$39,440
Cost:
-
$39,440 480,000 - - $39,440
480,000
kWh
-
-
MMBtu
06: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$3,375,000
Cost:
$500,000
$3,375,000 41,070,000 - - $3,375,000
41,070,000
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$3,475,045
Cost:
$660,674
$3,474,186 42,277,168 $859 107 $3,474,186
42,277,168
kWh
$859
107
MMBtu
TOTAL IMPLEMENTED Savings:
$3,375,000
Cost:
$500,000
$3,375,000 41,070,000 - - $3,375,000
41,070,000
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas