Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana State University
Assessment Year 2018
Principal Product Wastewater/Sewage Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 44
Plant Area (Sq.Ft.) 2,875,000
Annual Production 73,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,886,430 29,463,000 kWh $0.06
Natural Gas $34,875 5,472 MMBtu $6.37
TOTAL ENERGY COSTS $1,921,305
RECOMMENDED SAVINGS* $323,113 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $377
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$377
Cost:
$68
$377 5,887 - - $377
5,887
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,290
Cost:
$265
$1,290 20,151 - - $1,290
20,151
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,129
Cost:
$25,545
$41,129 642,634 - - $41,129
642,634
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$40,029
Cost:
$66,000
$40,029 625,302 - - $40,029
625,302
kWh
-
-
MMBtu
05: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$7,510
Cost:
$13,000
- - $7,510 1,179 -
-
kWh
$7,510
1,179
MMBtu
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$232,778
Cost:
$428,000
$232,778 3,637,152 - - $232,778
3,637,152
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$323,113
Cost:
$532,878
$315,603 4,931,126 $7,510 1,179 $315,603
4,931,126
kWh
$7,510
1,179
MMBtu
TOTAL IMPLEMENTED Savings:
$377
Cost:
$68
$377 5,887 - - $377
5,887
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas