IAC logo
IAC Assessment: MA0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1985
Principal Product SYNTHETIC YARN
NAICS n/a
SIC 2282 - Throwing And Winding Mills
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,468
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $469,251 6,412,954 kWh $0.07
Fuel Oil #2 $33,440 5,674 MMBtu $5.89
TOTAL ENERGY COSTS $502,691
RECOMMENDED SAVINGS* $22,298 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,202
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$10,926
Cost:
$455
- - $12,096 2,054 $(-1,170) - -
-
kWh
$12,096
2,054
MMBtu
$(-1,170)
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,276
Cost:
$703
- - $2,276 386 - - -
-
kWh
$2,276
386
MMBtu
-
-
$
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$942
Cost:
$1,016
- - $942 160 - - -
-
kWh
$942
160
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,180
Cost:
$931
$2,130 29,015 - - $4,050 - $2,130
29,015
kWh
-
-
MMBtu
$4,050
-
$
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$1,974
Cost:
$2,113
$1,974 - - - - - $1,974
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,298
Cost:
$5,218
$4,104 29,015 $15,314 2,600 $2,880 - $4,104
29,015
kWh
$15,314
2,600
MMBtu
$2,880
-
$
TOTAL IMPLEMENTED Savings:
$13,202
Cost:
$1,158
- - $14,372 2,440 $(-1,170) - -
-
kWh
$14,372
2,440
MMBtu
$(-1,170)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes