IAC logo
IAC Assessment: MA0127
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0127
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1988
Principal Product DECORATIVE WALL COVERING
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 166
Plant Area (Sq.Ft.) 0
Annual Production 72,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $403,815 5,585,873 kWh $0.07
Natural Gas $263,326 54,978 MMBtu $4.79
TOTAL ENERGY COSTS $667,141
RECOMMENDED SAVINGS* $91,963 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,377
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,207
Cost:
$2,710
$1,207 18,171 - - - - $1,207
18,171
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,242
Cost:
$386
$3,242 44,842 - - - - $3,242
44,842
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38,184
Cost:
$11,762
$38,184 528,136 - - - - $38,184
528,136
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$325
Cost:
$446
$325 4,396 - - - - $325
4,396
kWh
-
-
MMBtu
-
-
$
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$872
Cost:
$240
- - $872 182 - - -
-
kWh
$872
182
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$21,158
Cost:
-
$21,958 - - - $(-800) - $21,958
-
kWh
-
-
MMBtu
$(-800)
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$170
Cost:
-
$170 2,345 - - - - $170
2,345
kWh
-
-
MMBtu
-
-
$
08: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$26,805
Cost:
$31,196
- - $26,805 5,596 - - -
-
kWh
$26,805
5,596
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$91,963
Cost:
$46,740
$65,086 597,890 $27,677 5,778 $(-800) - $65,086
597,890
kWh
$27,677
5,778
MMBtu
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
$1,377
Cost:
$2,710
$1,377 20,516 - - - - $1,377
20,516
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes