IAC logo
IAC Assessment: MA0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1991
Principal Product FILTERS, REGULATORS, ETC
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 194
Plant Area (Sq.Ft.) 0
Annual Production 550,000 Pieces
Production Hrs. Annual 4,375
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,597 2,691,383 kWh $0.08
Fuel Oil #4 $39,722 6,552 MMBtu $6.06
TOTAL ENERGY COSTS $267,319
RECOMMENDED SAVINGS* $21,450 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,338
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Administrative Changes Electricity Usage Fuel Oil #4 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,565
Cost:
$30,000
$17,865 211,313 - - $(-3,300) - $17,865
211,313
kWh
-
-
MMBtu
$(-3,300)
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,963
Cost:
-
- - $1,963 324 - - -
-
kWh
$1,963
324
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,759
Cost:
$4,685
$1,759 20,809 - - - - $1,759
20,809
kWh
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,388
Cost:
$4,900
$1,388 15,826 - - - - $1,388
15,826
kWh
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$825
Cost:
$1,900
$825 9,672 - - - - $825
9,672
kWh
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$520
Cost:
$1,749
$520 6,155 - - - - $520
6,155
kWh
-
-
MMBtu
-
-
$
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$430
Cost:
$170
- - $430 71 - - -
-
kWh
$430
71
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,450
Cost:
$43,404
$22,357 263,775 $2,393 395 $(-3,300) - $22,357
263,775
kWh
$2,393
395
MMBtu
$(-3,300)
-
$
TOTAL IMPLEMENTED Savings:
$2,338
Cost:
$6,819
$1,908 21,981 $430 71 - - $1,908
21,981
kWh
$430
71
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $