IAC logo
IAC Assessment: MA0507
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0507
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2002
Principal Product Electronic Components and Assemblies
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 215
Plant Area (Sq.Ft.) 150,000
Annual Production 50,000 Pounds
Production Hrs. Annual 4,992
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $268,370 4,767,840 kWh $0.06
Electricity Demand $117,391 9,753 kW-months/year $12.04
Electricity Fees $35,124 - $ -
Natural Gas $74,207 8,486 MMBtu $8.74
TOTAL ENERGY COSTS $495,887
RECOMMENDED SAVINGS* $93,109 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,328
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$69,744
Cost:
$194,100
$(-3,189) (-56,132) $(-511) (-40) - - - - $(-1,000) - $74,444 - - - $(-3,189)
(-56,132)
kWh
$(-511)
(-40)
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,000)
-
$
$74,444
-
$
-
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,237
Cost:
$40,000
$1,509 29,700 - - $10,728 1,386 - - - - - - - - $1,509
29,700
kWh
-
-
kW-months/year
$10,728
1,386
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$4,940
Cost:
$4,000
$3,112 51,546 $1,828 143 - - - - - - - - - - $3,112
51,546
kWh
$1,828
143
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,037
Cost:
$35,500
$2,657 44,928 $1,380 108 - - - - - - - - - - $2,657
44,928
kWh
$1,380
108
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$795
Cost:
$3,230
- - - - - - $795 257,400 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$795
257,400
Tgal
-
-
$
-
-
$
-
-
$
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$576
Cost:
-
- - - - - - - - - - - - $576 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$576
-
$
07: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$567
Cost:
$500
- - - - - - - - - - - - $567 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$567
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$213
Cost:
-
$124 2,141 $89 7 - - - - - - - - - - $124
2,141
kWh
$89
7
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$93,109
Cost:
$277,330
$4,213 72,183 $2,786 218 $10,728 1,386 $795 257,400 $(-1,000) - $74,444 - $1,143 - $4,213
72,183
kWh
$2,786
218
kW-months/year
$10,728
1,386
MMBtu
$795
257,400
Tgal
$(-1,000)
-
$
$74,444
-
$
$1,143
-
$
TOTAL IMPLEMENTED Savings:
$71,328
Cost:
$197,330
$(-3,065) (-53,991) $(-422) (-33) - - $795 257,400 $(-1,000) - $74,444 - $576 - $(-3,065)
(-53,991)
kWh
$(-422)
(-33)
kW-months/year
-
-
MMBtu
$795
257,400
Tgal
$(-1,000)
-
$
$74,444
-
$
$576
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost