Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1999 |
Principal Product | Horse Feed |
NAICS | n/a |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 21 |
Plant Area (Sq.Ft.) | 32,000 |
Annual Production | 4,000 Pieces |
Production Hrs. Annual | 1,800 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $27,140 | 257,034 | kWh | $0.11 |
Electricity Fees | $586 | - | $ | - |
Fuel Oil #2 | $16,810 | 3,263 | MMBtu | $5.15 |
TOTAL ENERGY COSTS | $44,536 | |||
RECOMMENDED SAVINGS* | $45,599 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,815 Cost: $5,192 |
$3,815 | 31,653 | - | - | - | - | - | - | - | - | - | - |
$3,815 31,653 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,750 Cost: $4,260 |
$1,750 | 24,912 | - | - | - | - | - | - | - | - | - | - |
$1,750 24,912 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.9113 USE SOLAR HEAT FOR HEAT |
Savings: $1,220 Cost: $5,472 |
$1,220 | 11,430 | - | - | - | - | - | - | - | - | - | - |
$1,220 11,430 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $421 Cost: - |
- | - | - | - | - | - | - | - | $421 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
$421 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $309 Cost: $100 |
$309 | 2,931 | - | - | - | - | - | - | - | - | - | - |
$309 2,931 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $23,318 Cost: $212,393 |
- | - | $10,000 | 1,941 | $1,834 | 2,800 | $11,484 | - | - | - | - | - |
- - kWh |
$10,000 1,941 MMBtu |
$1,834 2,800 lb |
$11,484 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $13,050 Cost: $22,253 |
- | - | - | - | - | - | - | - | - | - | $13,050 | - |
- - kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$13,050 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $1,716 Cost: $612 |
- | - | - | - | - | - | $1,716 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$1,716 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,599 Cost: $250,282 |
$7,094 | 70,926 | $10,000 | 1,941 | $1,834 | 2,800 | $13,200 | - | $421 | - | $13,050 | - | $7,094 70,926 kWh |
$10,000 1,941 MMBtu |
$1,834 2,800 lb |
$13,200 - $ |
$421 - $ |
$13,050 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Increase in Production |