IAC logo
IAC Assessment: ME0273
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0273
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Horse Feed
NAICS n/a
SIC 2048 - Prepared Feeds, Nec
Sales $1,000,000-$5,000,000
# of Employees 21
Plant Area (Sq.Ft.) 32,000
Annual Production 4,000 Pieces
Production Hrs. Annual 1,800
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,140 257,034 kWh $0.11
Electricity Fees $586 - $ -
Fuel Oil #2 $16,810 3,263 MMBtu $5.15
TOTAL ENERGY COSTS $44,536
RECOMMENDED SAVINGS* $45,599 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production
$ kWh $ MMBtu $ lb $ $ $ $ $ %
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,815
Cost:
$5,192
$3,815 31,653 - - - - - - - - - - $3,815
31,653
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,750
Cost:
$4,260
$1,750 24,912 - - - - - - - - - - $1,750
24,912
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$1,220
Cost:
$5,472
$1,220 11,430 - - - - - - - - - - $1,220
11,430
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$421
Cost:
-
- - - - - - - - $421 - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
$421
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$309
Cost:
$100
$309 2,931 - - - - - - - - - - $309
2,931
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$23,318
Cost:
$212,393
- - $10,000 1,941 $1,834 2,800 $11,484 - - - - - -
-
kWh
$10,000
1,941
MMBtu
$1,834
2,800
lb
$11,484
-
$
-
-
$
-
-
%
07: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$13,050
Cost:
$22,253
- - - - - - - - - - $13,050 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$13,050
-
%
08: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$1,716
Cost:
$612
- - - - - - $1,716 - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
$1,716
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$45,599
Cost:
$250,282
$7,094 70,926 $10,000 1,941 $1,834 2,800 $13,200 - $421 - $13,050 - $7,094
70,926
kWh
$10,000
1,941
MMBtu
$1,834
2,800
lb
$13,200
-
$
$421
-
$
$13,050
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production Electricity Usage Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Administrative Changes Increase in Production