IAC logo
IAC Assessment: MO0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Heat Vent Air Equipment and Fixtures
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 133,990
Annual Production 175 Pieces
Production Hrs. Annual 4,680
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,948 840,270 kWh $0.04
Electricity Demand $17,408 373 kW-months/year $46.67
Electricity Fees $3,588 - $ -
Natural Gas $53,575 8,451 MMBtu $6.34
TOTAL ENERGY COSTS $125,539
RECOMMENDED SAVINGS* $73,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,151
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$23,659
Cost:
$30,000
- - - - - - $23,659 - -
-
kWh
-
-
kW-months/year
-
-
lb
$23,659
-
$
02: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$14,206
Cost:
$25,000
- - - - - - $14,206 - -
-
kWh
-
-
kW-months/year
-
-
lb
$14,206
-
$
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$10,720
Cost:
$3,700
- - - - - - $10,720 - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,720
-
$
04: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$6,499
Cost:
$12,500
- - - - - - $6,499 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,499
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$744
Cost:
$1,472
$562 12,016 $182 4 - - - - $562
12,016
kWh
$182
4
kW-months/year
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$280
Cost:
$491
$210 4,396 $70 2 - - - - $210
4,396
kWh
$70
2
kW-months/year
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$280
Cost:
$552
$252 5,275 $28 1 - - - - $252
5,275
kWh
$28
1
kW-months/year
-
-
lb
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$641
Cost:
$80
$552 11,723 $89 2 - - - - $552
11,723
kWh
$89
2
kW-months/year
-
-
lb
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$390
Cost:
$100
$259 5,569 $131 3 - - - - $259
5,569
kWh
$131
3
kW-months/year
-
-
lb
-
-
$
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,452
Cost:
$2,554
$1,162 24,619 $290 6 - - - - $1,162
24,619
kWh
$290
6
kW-months/year
-
-
lb
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$79
Cost:
-
$65 1,465 $14 1 - - - - $65
1,465
kWh
$14
1
kW-months/year
-
-
lb
-
-
$
12: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$8,305
Cost:
$20,000
- - - - $8,305 1,470 - - -
-
kWh
-
-
kW-months/year
$8,305
1,470
lb
-
-
$
13: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$6,715
Cost:
$17,500
- - - - $6,715 368 - - -
-
kWh
-
-
kW-months/year
$6,715
368
lb
-
-
$
TOTAL RECOMMENDED Savings:
$73,970
Cost:
$113,949
$3,062 65,063 $804 19 $15,020 1,838 $55,084 - $3,062
65,063
kWh
$804
19
kW-months/year
$15,020
1,838
lb
$55,084
-
$
TOTAL IMPLEMENTED Savings:
$17,151
Cost:
$29,617
$2,258 48,065 $687 16 - - $14,206 - $2,258
48,065
kWh
$687
16
kW-months/year
-
-
lb
$14,206
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost