IAC logo
IAC Assessment: MO0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product RTA (Ready-to Assembly) Furniture
NAICS n/a
SIC 2511 - Wood Household Furniture
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 500,000
Annual Production 1,800,000 Pieces
Production Hrs. Annual 4,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $366,747 7,401,231 kWh $0.05
Electricity Demand $42,367 1,765 kW-months/year $24.00
Electricity Fees $54,756 - $ -
Natural Gas $148,399 46,108 MMBtu $3.22
TOTAL ENERGY COSTS $675,434
RECOMMENDED SAVINGS* $273,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $161,592
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$86,930
Cost:
$91,375
- - - - - - $86,930 - -
-
kWh
-
-
kW-months/year
-
-
lb
$86,930
-
$
02: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$16,820
Cost:
$3,500
- - - - - - $16,820 - -
-
kWh
-
-
kW-months/year
-
-
lb
$16,820
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,021
Cost:
$1,297
$1,853 32,532 $168 7 - - - - $1,853
32,532
kWh
$168
7
kW-months/year
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$408
Cost:
$690
$384 6,741 $24 1 - - - - $384
6,741
kWh
$24
1
kW-months/year
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,259
Cost:
$160
$2,971 52,169 $288 12 - - - - $2,971
52,169
kWh
$288
12
kW-months/year
-
-
lb
-
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,463
Cost:
$622
$1,319 23,154 $144 6 - - - - $1,319
23,154
kWh
$144
6
kW-months/year
-
-
lb
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,263
Cost:
$7,769
$3,855 67,702 $408 17 - - - - $3,855
67,702
kWh
$408
17
kW-months/year
-
-
lb
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,546
Cost:
-
$1,402 24,619 $144 6 - - - - $1,402
24,619
kWh
$144
6
kW-months/year
-
-
lb
-
-
$
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$93,928
Cost:
$39,600
- - - - $93,928 1,300 - - -
-
kWh
-
-
kW-months/year
$93,928
1,300
lb
-
-
$
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$63,165
Cost:
$15,100
- - - - $63,165 1,510 - - -
-
kWh
-
-
kW-months/year
$63,165
1,510
lb
-
-
$
TOTAL RECOMMENDED Savings:
$273,803
Cost:
$160,113
$11,784 206,917 $1,176 49 $157,093 2,810 $103,750 - $11,784
206,917
kWh
$1,176
49
kW-months/year
$157,093
2,810
lb
$103,750
-
$
TOTAL IMPLEMENTED Savings:
$161,592
Cost:
$116,391
$10,465 183,763 $1,032 43 $63,165 1,510 $86,930 - $10,465
183,763
kWh
$1,032
43
kW-months/year
$63,165
1,510
lb
$86,930
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost