IAC logo
IAC Assessment: MO0279
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0279
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product pipe organs
NAICS n/a
SIC 3931 - Musical Instruments
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 165,000
Annual Production 23 Pieces
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,458 581,770 kWh $0.04
Electricity Demand $17,961 282 kW-months/year $63.69
Electricity Fees $1,866 - $ -
Natural Gas $26,931 5,720 MMBtu $4.71
TOTAL ENERGY COSTS $75,056
RECOMMENDED SAVINGS* $20,815 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,423
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$508
Cost:
$1,251
$317 6,741 $191 3 - - - - $317
6,741
kWh
$191
3
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$988
Cost:
$1,945
$606 12,896 $382 6 - - - - $606
12,896
kWh
$382
6
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$119
Cost:
$88
$55 1,172 $64 1 - - - - $55
1,172
kWh
$64
1
kW-months/year
-
-
lb
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,280
Cost:
$4,500
- - $8,280 115 - - - - -
-
kWh
$8,280
115
kW-months/year
-
-
lb
-
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$124
Cost:
$276
$124 2,638 - - - - - - $124
2,638
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$396
Cost:
$960
- - - - $396 16 - - -
-
kWh
-
-
kW-months/year
$396
16
lb
-
-
$
07: 4.446 AUTOMATE FINISHING PROCESS Savings:
$6,240
Cost:
$205
- - - - - - $6,240 - -
-
kWh
-
-
kW-months/year
-
-
lb
$6,240
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,160
Cost:
$486
- - - - - - $4,160 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,160
-
$
TOTAL RECOMMENDED Savings:
$20,815
Cost:
$9,711
$1,102 23,447 $8,917 125 $396 16 $10,400 - $1,102
23,447
kWh
$8,917
125
kW-months/year
$396
16
lb
$10,400
-
$
TOTAL IMPLEMENTED Savings:
$11,423
Cost:
$2,990
$372 7,913 $255 4 $396 16 $10,400 - $372
7,913
kWh
$255
4
kW-months/year
$396
16
lb
$10,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes