IAC Assessment: MS0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Filters and Filtration Systems
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 325
Plant Area (Sq.Ft.) 206,000
Annual Production 1,768,750 Pieces
Production Hrs. Annual 4,080
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,681 4,072,685 kWh $0.03
Electricity Demand $73,878 9,024 kW-months/year $8.19
Electricity Fees $5,862 - $ -
Natural Gas $73,116 12,695 MMBtu $5.76
TOTAL ENERGY COSTS $322,864
RECOMMENDED SAVINGS* $24,737 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,693
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,280
Cost:
-
- - $1,280 146 - - - - - - -
-
kWh
$1,280
146
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,839
Cost:
$7,200
$1,462 46,014 $1,377 157 - - - - - - $1,462
46,014
kWh
$1,377
157
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$6,251
Cost:
$1,000
- - - - $6,251 1,078 - - - - -
-
kWh
-
-
kW-months/year
$6,251
1,078
MMBtu
-
-
lb
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$954
Cost:
$711
$954 30,188 - - - - - - - - $954
30,188
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$12,000
Cost:
$6,500
- - - - - - - - $12,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$12,000
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,413
Cost:
-
- - - - - - $1,413 16,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,413
16,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$24,737
Cost:
$15,411
$2,416 76,202 $2,657 303 $6,251 1,078 $1,413 16,000 $12,000 - $2,416
76,202
kWh
$2,657
303
kW-months/year
$6,251
1,078
MMBtu
$1,413
16,000
lb
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$2,693
Cost:
-
- - $1,280 146 - - $1,413 16,000 - - -
-
kWh
$1,280
146
kW-months/year
-
-
MMBtu
$1,413
16,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes