IAC logo
IAC Assessment: MS0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2002
Principal Product Industrial lifting equipment
NAICS n/a
SIC 3537 - Industrial Trucks And Tractors
Sales $50,000,000-$100,000,000
# of Employees 513
Plant Area (Sq.Ft.) 474,000
Annual Production 450 Pieces
Production Hrs. Annual 7,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $247,968 7,166,700 kWh $0.03
Electricity Demand $194,314 18,297 kW-months/year $10.62
Electricity Fees $6,719 - $ -
Natural Gas $189,608 38,024 MMBtu $4.99
TOTAL ENERGY COSTS $696,221
RECOMMENDED SAVINGS* $92,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,542
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$26,748
Cost:
$7,400
- - - - - - $26,748 5,281 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$26,748
5,281
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,371
Cost:
$11,500
- - $6,276 640 $95 - - - - - - - - - -
-
kWh
$6,276
640
kW-months/year
$95
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,766
Cost:
$288
$3,708 107,175 - - $58 - - - - - - - - - $3,708
107,175
kWh
-
-
kW-months/year
$58
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,765
Cost:
$3,400
$3,709 107,201 - - $56 - - - - - - - - - $3,709
107,201
kWh
-
-
kW-months/year
$56
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,288
Cost:
$270
$995 28,760 $1,260 119 $33 - - - - - - - - - $995
28,760
kWh
$1,260
119
kW-months/year
$33
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$1,230
Cost:
$1,395
$618 17,847 $595 56 $17 - - - - - - - - - $618
17,847
kWh
$595
56
kW-months/year
$17
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,517
Cost:
$1,416
$1,497 43,200 - - $20 - - - - - - - - - $1,497
43,200
kWh
-
-
kW-months/year
$20
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$582
Cost:
-
$573 16,572 - - $9 - - - - - - - - - $573
16,572
kWh
-
-
kW-months/year
$9
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$557
Cost:
$200
$209 6,038 $340 32 $8 - - - - - - - - - $209
6,038
kWh
$340
32
kW-months/year
$8
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
10: 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING Savings:
$6,462
Cost:
$6,610
- - - - - - - - $5,176 10,746 - - $1,286 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,176
10,746
lb
-
-
$
$1,286
-
$
11: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$38,952
Cost:
$153,600
- - - - - - - - - - $38,952 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$38,952
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$92,238
Cost:
$186,079
$11,309 326,793 $8,471 847 $296 - $26,748 5,281 $5,176 10,746 $38,952 - $1,286 - $11,309
326,793
kWh
$8,471
847
kW-months/year
$296
-
$
$26,748
5,281
MMBtu
$5,176
10,746
lb
$38,952
-
$
$1,286
-
$
TOTAL IMPLEMENTED Savings:
$41,542
Cost:
$21,053
$6,103 176,392 $8,471 847 $220 - $26,748 5,281 - - - - - - $6,103
176,392
kWh
$8,471
847
kW-months/year
$220
-
$
$26,748
5,281
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost