Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1993 |
Principal Product | Furniture |
NAICS | n/a |
SIC | 2511 - Wood Household Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 268 |
Plant Area (Sq.Ft.) | 248,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,310 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $193,925 | 3,679,074 | kWh | $0.05 |
Natural Gas | $1,292 | 125 | MMBtu | $10.34 |
Fuel Oil #2 | $2,002 | 343 | MMBtu | $5.84 |
Other Energy | $16,276 | 4,332 | MMBtu | $3.76 |
TOTAL ENERGY COSTS | $213,495 | |||
RECOMMENDED SAVINGS* | $53,294 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,349 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Wood | Electricity Usage | Fuel Oil #2 | Wood | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $16,854 Cost: $32,000 |
$16,854 | 172,333 | - | - | - | - |
$16,854 172,333 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,805 Cost: $6,000 |
- | - | $3,805 | 1,012 | - | - |
- - kWh |
$3,805 1,012 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,206 Cost: $1,590 |
$1,206 | 22,860 | - | - | - | - |
$1,206 22,860 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,580 Cost: - |
$4,580 | 86,460 | - | - | - | - |
$4,580 86,460 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $770 Cost: $450 |
$770 | 14,654 | - | - | - | - |
$770 14,654 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,702 Cost: $10,980 |
$10,702 | 201,934 | - | - | - | - |
$10,702 201,934 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,177 Cost: $2,106 |
$2,177 | 41,032 | - | - | - | - |
$2,177 41,032 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1222 INSTALL TURBULATORS |
Savings: $8,700 Cost: $1,500 |
- | - | - | - | $8,700 | 2,550 |
- - kWh |
- - MMBtu |
$8,700 2,550 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $4,500 Cost: $200 |
$4,500 | - | - | - | - | - |
$4,500 - kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,294 Cost: $54,826 |
$40,789 | 539,273 | $3,805 | 1,012 | $8,700 | 2,550 | $40,789 539,273 kWh |
$3,805 1,012 MMBtu |
$8,700 2,550 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,349 Cost: $15,036 |
$13,649 | 257,620 | - | - | $8,700 | 2,550 | $13,649 257,620 kWh |
- - MMBtu |
$8,700 2,550 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Wood | Electricity Usage | Fuel Oil #2 | Wood |