IAC logo
IAC Assessment: NC0008
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0008
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 1993
Principal Product Metal File Cabinets
NAICS n/a
SIC 2522 - Office Furniture, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 270
Plant Area (Sq.Ft.) 273,600
Annual Production 0 Units
Production Hrs. Annual 4,625
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,802 4,827,960 kWh $0.05
Natural Gas $139,200 41,822 MMBtu $3.33
TOTAL ENERGY COSTS $373,002
RECOMMENDED SAVINGS* $29,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,974
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,237
Cost:
$750
- - $6,237 1,686 - - -
-
kWh
$6,237
1,686
MMBtu
-
-
$
02: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$3,254
Cost:
$3,500
$3,254 44,842 - - - - $3,254
44,842
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,091
Cost:
$13,201
$5,091 106,096 - - - - $5,091
106,096
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,736
Cost:
$13,007
$3,736 77,667 - - - - $3,736
77,667
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,196
Cost:
$180
$2,196 45,721 - - - - $2,196
45,721
kWh
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,395
Cost:
$2,500
- - $1,395 377 - - -
-
kWh
$1,395
377
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,260
Cost:
$12,244
$(-33) (-586) - - $5,293 - $(-33)
(-586)
kWh
-
-
MMBtu
$5,293
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,691
Cost:
$150
$1,691 31,653 - - - - $1,691
31,653
kWh
-
-
MMBtu
-
-
$
09: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$347
Cost:
$330
- - $347 102 - - -
-
kWh
$347
102
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,207
Cost:
$45,862
$15,935 305,393 $7,979 2,165 $5,293 - $15,935
305,393
kWh
$7,979
2,165
MMBtu
$5,293
-
$
TOTAL IMPLEMENTED Savings:
$17,974
Cost:
$38,782
$12,681 260,551 - - $5,293 - $12,681
260,551
kWh
-
-
MMBtu
$5,293
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes