Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1996 |
Principal Product | Electric soldering tools |
NAICS | n/a |
SIC | 3690 - |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 169,000 |
Annual Production | 2,300,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | SC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $250,725 | 6,913,834 | kWh | $0.04 |
Electricity Demand | $155,963 | 14,441 | kW-months/year | $10.80 |
Natural Gas | $15,120 | 3,502 | MMBtu | $4.32 |
Fuel Oil #2 | $4,170 | 687 | MMBtu | $6.07 |
TOTAL ENERGY COSTS | $425,978 | |||
RECOMMENDED SAVINGS* | $106,467 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,709 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $68,531 Cost: $132,000 |
$63,563 | 1,752,638 | $37,260 | 3,450 | $(-32,292) | (-7,475) | - | - | - | - |
$63,563 1,752,638 kWh |
$37,260 3,450 kW-months/year |
$(-32,292) (-7,475) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $946 Cost: $1,155 |
$653 | 17,878 | $389 | 36 | $(-96) | (-22) | - | - | - | - |
$653 17,878 kWh |
$389 36 kW-months/year |
$(-96) (-22) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $368 Cost: $195 |
$254 | 7,034 | $151 | 14 | $(-37) | (-9) | - | - | - | - |
$254 7,034 kWh |
$151 14 kW-months/year |
$(-37) (-9) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $3,668 Cost: $6,000 |
$3,668 | 101,114 | - | - | - | - | - | - | - | - |
$3,668 101,114 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $18,922 Cost: $56,200 |
$2,923 | 80,598 | $2,979 | 276 | $13,020 | 3,014 | - | - | - | - |
$2,923 80,598 kWh |
$2,979 276 kW-months/year |
$13,020 3,014 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,524 Cost: $28,500 |
$9,524 | 262,603 | - | - | - | - | - | - | - | - |
$9,524 262,603 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $802 Cost: $420 |
$434 | 12,016 | $368 | 34 | - | - | - | - | - | - |
$434 12,016 kWh |
$368 34 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $884 Cost: $600 |
$554 | 15,240 | $330 | 31 | - | - | - | - | - | - |
$554 15,240 kWh |
$330 31 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,412 Cost: $500 |
$853 | 23,447 | $559 | 52 | - | - | - | - | - | - |
$853 23,447 kWh |
$559 52 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $199 Cost: $168 |
$45 | 1,172 | $22 | 2 | - | - | - | - | $132 | - |
$45 1,172 kWh |
$22 2 kW-months/year |
- - MMBtu |
- - lb |
$132 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $246 Cost: $980 |
$125 | 3,517 | $51 | 5 | - | - | - | - | $70 | - |
$125 3,517 kWh |
$51 5 kW-months/year |
- - MMBtu |
- - lb |
$70 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $909 Cost: $761 |
$569 | 15,826 | $340 | 31 | - | - | - | - | - | - |
$569 15,826 kWh |
$340 31 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $56 Cost: $100 |
- | - | - | - | - | - | $56 | 3,750 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$56 3,750 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $106,467 Cost: $227,579 |
$83,165 | 2,293,083 | $42,449 | 3,931 | $(-19,405) | (-4,492) | $56 | 3,750 | $202 | - | $83,165 2,293,083 kWh |
$42,449 3,931 kW-months/year |
$(-19,405) (-4,492) MMBtu |
$56 3,750 lb |
$202 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,709 Cost: $9,596 |
$5,569 | 153,575 | $1,110 | 103 | $(-96) | (-22) | $56 | 3,750 | $70 | - | $5,569 153,575 kWh |
$1,110 103 kW-months/year |
$(-96) (-22) MMBtu |
$56 3,750 lb |
$70 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost |